LOCATION: Smith Memorial Student Union (SMSU)
DURATION: 9/11/2025 from 9:30:00 AM to 2:30:00 PM
PROJECT INFORMATION: Kone will be performing their annual testing and maintenance of the elevator.
PROJECT BENEFITS: Testing and maintenance will ensure the elevator operates properly.
IMPACT: Elevator #7 will be out of service from 9:30AM to 11:30AM. To access the basement level and floors 2 through 4, please use elevator #6. For access to the Sub-Basement level, use the stairwell. If you require ADA access to the Sub-Basement level, please contact the Work Control Center.
Elevator #6 will be out of service from 12:30AM to 2:30AM. To access the Sub-Basement level and floors 2 through 4, please use elevator #7.
ACCESSIBILITY IMPACTS: ADA access to the Sub-Basement will be impacted during the time that elevator #7 is not operational (9:30AM to 11:30AM). If you require ADA access to the Sub-Basement level during this time, please contact the Work Control Center.
PROJECT COORDINATORS:
NAME | PHONE | |
---|---|---|
Work Control Center |
503 725 2349 |
2f...@pdx.edu |
Jim Kavalec |
971-275-7235 |
kav...@pdx.edu |
Cary Morris |
503-725-9972 |
cary....@pdx.edu |
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407