7/17/2026: (SMSU) Re-Roof Project

0 views
Skip to first unread message

PSU 2FIX

unread,
Jul 9, 2026, 6:22:11 PMJul 9
to Smith Memorial Student Union Impact Notices, accessibility...@pdx.edu, Disability Resource Center

UPCOMING IMPACT NOTICE

FOR IMMEDIATE DISTRIBUTION
* * Deans, Directors & Department Chairs: Please distribute to your department personnel * *

LOCATION: Smith Memorial Student Union (SMSU)

DURATION: 7/17/2026 from 5:00:00 AM to 7:00:00 PM

PROJECT INFORMATION: The SMSU Re-Roof Project will be replacing the existing roof system 

Upcoming construction activities: Crane pick to lift roofing supplies onto the SMSU roof.

PROJECT BENEFITS: The new roofing system will provide improved weather protection, enhance the building's energy efficiency, and prevent future water intrusion, ensuring a more comfortable environment for all students and staff.

IMPACT: See attached diagram showing impacts. 

The pedestrian Pathway between SW Montgomery and SW Harrison on the East side of SMSU will be closed from 5:00AM -7:00 PM. The East Main Entrance to the Smith Memorial will be closed. Alternative routing will be posted.

As a precaution the Third Floor Mezzanine and Second Floor Mezzanine located directly below the loading zone will remain closed during lift operations. See plans for impacted areas.

ACCESSIBILITY IMPACTS: - Entrances: The East Main entrance will be closed. 

 - ADA Entrance: The SMSU North Entrance is the nearest ADA entrance. 

 - Alternative Routes: If a specific pathway or entrance is temporarily closed, directional signage will be posted to the nearest alternative

PROJECT COORDINATORS:

NAME PHONE EMAIL
Anthony Moreschi
503-725-2837
more...@pdx.edu
Quinn Soifer
503-725
soi...@pdx.edu



ADDITIONAL INFORMATION:

If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407



7/17/2026_Smith Memorial Student Union (SMSU)