LOCATION: Broadway Residence Hall (BDWY)
DURATION: 3/23/2026 from 6:30:00 AM to 10:30:00 AM
PROJECT INFORMATION: Kone Elevator will be on-site to replace door control board on elevator #61.
PROJECT BENEFITS: Replacement will improve elevator operation and reliability.
IMPACT: Elevator wait times may be longer than normal due to this work.
Elevator #60 will remain in service and operational.
ACCESSIBILITY IMPACTS: Elevator wait times may be longer than normal due to this work. No accessibility impacts are anticipated.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| James Kavalec |
971-275-7235 |
kav...@pdx.edu |
| Work Control Center |
503-725-2349 |
2f...@pdx.edu |
| |
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407