UPCOMING IMPACT NOTICE

FOR IMMEDIATE DISTRIBUTION
* * Deans, Directors & Department Chairs: Please distribute to your department personnel * *

LOCATION: Peter Stott Center (PSC)

DURATION: 3/18/2026 from 6:00:00 AM to 4:00:00 PM

PROJECT INFORMATION: PSU crews will be installing a new safety handrail on the high (west) wall of the Peter Stott Center loading dock, which is located on the northeast side of the building.

PROJECT BENEFITS: This installation will provide a permanent safety barrier for staff and vendors, ensuring the facility meets updated safety standards for those working near the elevated dock wall.

IMPACT: Rolling Door Closure: The area immediately surrounding the rolling door will be closed to all traffic for the duration of the work. 

Delivery Rescheduling: The loading dock will be inaccessible to vehicles. Please reschedule any deliveries requiring the rolling door or dock access to another day. 

Noise: Occupants in the northeast side of the building may hear intermittent noise from drilling into concrete and metalwork.

ACCESSIBILITY IMPACTS: The rolling door will be out of service. This is not a primary ADA pedestrian entrance; however, the main ADA-accessible entrances to the building remain open and unaffected. If this closure impacts a specific equipment transport route you rely on, please contact the project manager for assistance.

PROJECT COORDINATORS:

NAME PHONE EMAIL
Carrie Ficek
503-725-5059
Cfi...@pdx.edu






ADDITIONAL INFORMATION:

If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407



3/18/2026_Peter Stott Center (PSC)

PSU 2FIX

unread,
Mar 18, 2026, 6:58:25 PMMar 18
to Impact-Notic...@pdx.edu, accessibility...@pdx.edu, Disability Resource Center
UPDATE: Project date has been rescheduled for Thursday, March 19, 6am - 2pm

UPCOMING IMPACT NOTICE

FOR IMMEDIATE DISTRIBUTION
* * Deans, Directors & Department Chairs: Please distribute to your department personnel * *

LOCATION: Peter Stott Center (PSC)

DURATION: 3/19/2026 from 6:00:00 AM to 2:00:00 PM

PROJECT INFORMATION: PSU crews will be installing a new safety handrail on the high (west) wall of the Peter Stott Center loading dock, which is located on the northeast side of the building.

PROJECT BENEFITS: This installation will provide a permanent safety barrier for staff and vendors, ensuring the facility meets updated safety standards for those working near the elevated dock wall.

IMPACT: Rolling Door Closure: The area immediately surrounding the rolling door will be closed to all traffic for the duration of the work. 

Delivery Rescheduling: The loading dock will be inaccessible to vehicles. Please reschedule any deliveries requiring the rolling door or dock access to another day. 

Noise: Occupants in the northeast side of the building may hear intermittent noise from drilling into concrete and metalwork.

ACCESSIBILITY IMPACTS: The rolling door will be out of service. This is not a primary ADA pedestrian entrance; however, the main ADA-accessible entrances to the building remain open and unaffected. If this closure impacts a specific equipment transport route you rely on, please contact the project manager for assistance.

PROJECT COORDINATORS:

NAMEPHONEEMAIL
Carrie Ficek
503-725-5059
Cfi...@pdx.edu






ADDITIONAL INFORMATION:

If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407

Work Control Center

Facilities and Property Management

202 University Services Building

617 SW Montgomery

Portland, OR 97201

Phone: 503-725-2FIX

Email: 2F...@pdx.edu

Click Here for the Work Control Center Online 


~ Supporting Student Success ~


PSC26C03_Dock Railing Impact Notice _2026-03-12 (1) (1).pdf

PSU 2FIX

unread,
Mar 18, 2026, 7:09:07 PMMar 18
to Impact-Notic...@pdx.edu, accessibility...@pdx.edu, Disability Resource Center
UPDATE:  PSU crews will be drilling on the high (west) wall of the Peter Stott Center loading dock, in preparation to install a guard rail. There will be noise in the immediate area of the dock related to drilling the railing bolt anchors. Minor sounds might be heard within the building near the loading dock.

This work will not require the loading dock to be closed

Work Control Center

Facilities and Property Management

202 University Services Building

617 SW Montgomery

Portland, OR 97201

Phone: 503-725-2FIX

Email: 2F...@pdx.edu

Click Here for the Work Control Center Online 


~ Supporting Student Success ~


Reply all
Reply to author
Forward
0 new messages