LOCATION: Richard and Maurine Neuberger Center (RMNC)
DURATION: 3/27/2026 from 6:00:00 AM to 7:00:00 AM
PROJECT INFORMATION: Facilities will be installing a meter on a 3rd floor electrical panel for a minimum of 30 days.
PROJECT BENEFITS: The electrical panel in question also feeds power to the 4th floor. Determining existing power loads will allow for the electrical design of the 4th floor renovation to proceed.
IMPACT: Power outlets on the East and South sides of the 3rd floor of RMNC will definitely lose power (reference highlighted areas on the attached map). To be cautious, it is best to assume all power outlets on the 3rd floor will be lose power. It is highly recommended to shut down computers the evening prior to the work. While refrigerators on the 3rd floor will lose power, it will not be long enough to spoil any food inside.
ACCESSIBILITY IMPACTS: Plan for there not to be any outlet power on the 3rd floor during this impact.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Joseph Wuest |
850-293-1010 |
jwu...@pdx.edu |
| Carrie Ficek |
503-725-5059 |
cfi...@pdx.edu |
| |
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407