LOCATION: Academic and Student Recreation Center (ASRC)
DURATION: 3/16/2026 from 6:00:00 AM to 8:00:00 AM
PROJECT INFORMATION: Contractor will be on site to replace two (2) existing cameras that are outdated inside the ASRC Freight Elevator #78.
PROJECT BENEFITS: Updating old cameras increases security for building occupants, thus improving overall campus safety.
IMPACT: Work will require elevator to be parked during the duration of the work. As soon as work is complete, the elevator will resume operation.
ACCESSIBILITY IMPACTS: The freight elevator in ASRC will be out of service for the duration of this impact. If possible, please use alternate elevators such as #75 or #76. Access to the upper floors of Campus Rec may be limited to the stairwell during this time.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Access Control |
503-725-9345 |
access...@pdx.edu |
| Keith Childs |
503-608-9295 |
keith....@premgrp.com |
| |
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407