LOCATION: Smith Memorial Student Union (SMSU)
DURATION: 10/30/2025 from 4:30:00 AM to 3:00:00 PM
PROJECT INFORMATION: The SMSU Critical Infrastructure Project - HVAC and Elevator Upgrades, will replace the SF-1, SF-4 and SF-12 Heating Ventilation and Cooling systems serving the east half of Smith Memorial Student Union, and modernize Elevators 6, 7 & 15. The project is scheduled to begin on 8/15, and complete in September of 2026. The first phase will demo and replace SF-4.
Upcoming construction activities:
Crane pick to lift equipment and materials onto roof.
PROJECT BENEFITS: To replace critical building equipment that is beyond their useful life and which will improve the efficiency and reliability of the the building's HVAC and Elevators.
IMPACT: See attached diagram showing impacts.
Sidewalk, and parking area on SW Broadway Ave in front of Smith will be closed 4:30am - 3:00pm. Bike lane will be re-routed, follow posted signage. SW Broadway Ave ADA entrance will be closed 4:30am - 3:00pm. Other entrances to Smith Memorial Union will be open per normal operation.
Mezzanine levels 2 & 3 underneath the crane landing area will remain closed during the lift.
ACCESSIBILITY IMPACTS: Accessible ADA entrance on SW Broadway Ave will be closed 4:30am - 3:00pm. Use alternative accessible ADA entrance, SW Montgomery pedestrian street, on north side building between Cramer Hall and the SMSU building.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Matt Gall |
503-725-6289 |
m...@pdx.edu |
| Quinn Soifer |
503-725-4316 |
soi...@pdx.edu |
| |
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407