LOCATION: Fariborz Maseeh Hall (FMH)
DURATION: 3/20/2026 from 5:00:00 AM to 7:00:00 AM
PROJECT INFORMATION: On Friday March 20th a contractor will be installing electrical metering equipment as a requirement of the design of the new Student Health And Counseling Center (SHAC). This will result in a series of power shutdowns in the Eastern half of the building. The building will be closed for access during this work.
PROJECT BENEFITS: This information will help inform the design for the new Student Health and Counseling Center that will be relocating to the second floor of FMH.
IMPACT: -The Eastern half of the building will go through a series of power shutdowns over the course of 2hours from approximately 5am-7am
- The building will be closed for access during the power shutdown. It will fully reopen when power is restored.
ACCESSIBILITY IMPACTS: The building will be closed for access during the power shutdown. It will fully reopen when power is restored.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Jackson Elsasser |
(503) 725-9837 |
jack...@pdx.edu |
| George Kafouros |
(971) 246-3841 |
g.kaf...@pdx.edu |
| Joseph Wuest |
(850) 293-1010 |
jwu...@pdx.edu |
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738