LOCATION: Montgomery Residence Hall (MONT)
DURATION: 9/9/2025 from 12:30:00 PM to 2:30:00 PM
PROJECT INFORMATION: Kone will be performing their annual testing and maintenance of the elevator.
PROJECT BENEFITS: Testing and maintenance will ensure the elevator operates properly.
IMPACT: The building elevator will be out of service during this time. To access the basemen and 2nd through 4th floors, please use the stairs. If you require ADA access to these floors, please contact the Work Control Center.
ACCESSIBILITY IMPACTS: There will be no ADA access to the basement and the 2nd through 4th floors. If you require ADA access to these floors, please contact the Work Control Center.
PROJECT COORDINATORS:
NAME | PHONE | |
---|---|---|
Work Control Center |
503 725 2349 |
2f...@pdx.edu |
Jim Kavalec |
971-275-7235 |
kav...@pdx.edu |
Cary Morris |
503-725-9972 |
cary....@pdx.edu |
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407