6/17/2026: FAB - Temporary Power Loss

0 views
Skip to first unread message

PSU 2FIX

unread,
Jun 4, 2026, 2:09:26 PMJun 4
to Impact-Notic...@pdx.edu, accessibility...@pdx.edu

UPCOMING IMPACT NOTICE

FOR IMMEDIATE DISTRIBUTION
* * Deans, Directors & Department Chairs: Please distribute to your department personnel * *

LOCATION: Fourth Avenue Building (FAB)

DURATION: 6/17/2026 from 6:00:00 AM to 8:00:00 AM

PROJECT INFORMATION: PSU Facilities will be on site to refeed some Telecom and controls loads to a new power source.

PROJECT BENEFITS: Removes last loads from the building UPS, allowing us to decommission said UPS and save the University funding on maintaining and repairing it.

IMPACT: Direct impact will be power loss to the lower-level elevator lobby tables and some telecom equipment (reference attached map). Indirect impact is the loss of controls for switching between the two PGE power feeds to the building and the generator. In case we lose power during this work, an electrical contractor will be on site to transfer power manually, it will just take a little longer than automatic switching.

ACCESSIBILITY IMPACTS: In the event of a power loss, it will be a little longer for power to come back on.

PROJECT COORDINATORS:

NAME PHONE EMAIL
Joseph Wuest
(503) 725-9941
jwu...@pdx.edu
Tosh Sheridan
(503) 860-2167
to...@pdx.edu



ADDITIONAL INFORMATION:

If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407


Work Control Center

Facilities and Property Management

202 University Services Building

617 SW Montgomery

Portland, OR 97201

Phone: 503-725-2FIX

Email: 2F...@pdx.edu

Click Here for the Work Control Center Online 


~ Supporting Student Success ~


6_17_2026_Fourth Avenue Building (FAB).PDF