LOCATION: Smith Memorial Student Union (SMSU)
DURATION: 5/11/2026 to 7/3/2026
PROJECT INFORMATION: Smith Memorial Student Union Rooms 229 and 230 will be closed to expand the Pacific Islander, Asian, and Asian American Student Center by demolishing the shared wall, creating stairs within the room for upper level access, and installing metal fabricated panels on the upper ledge.
PROJECT BENEFITS: The Pacific Islander, Asian, and Asian American Student Center will be expanded to better serve the needs of students.
IMPACT: The Pacific Islander, Asian, and Asian American Student Center will be inaccessible and there may be intermittent access impacts to the adjacent corridor. There will be noise impacts and construction personnel in and out of the space for the duration of the project.
ACCESSIBILITY IMPACTS: The Pacific Islander, Asian, and Asian American Student Center will be inaccessible for the duration of this project. There may be intermittent access impacts to the adjacent corridor.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Jeremy Smith |
757-633-2136 |
jer...@pdx.edu |
| Steve Rounds |
503-725-8948 |
sro...@pdx.edu |
| |
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407
Work Control Center
Facilities and Property Management
202 University Services Building
617 SW Montgomery
Portland, OR 97201
Phone: 503-725-2FIX
Email: 2F...@pdx.edu
Click Here for the Work Control Center Online
~ Supporting Student Success ~