LOCATION: 2033 SW 4th Avenue (Vacant lot adjacent to the Art Building)
DURATION: 6/8/2026 to 7/31/2026
PROJECT INFORMATION: The "The Courts 2.0" project involves the redevelopment of the vacant lot located at 2033 SW 4th Avenue. Work includes clearing existing hard surfaces, installing new Asphalt Paving and a new sloped Concrete Terrace as well as making efficient improvements of the existing site infrastructure to create a dedicated space for the skateboarding community.
PROJECT BENEFITS: This project transforms an underutilized vacant space into a functional, improved campus amenity for student and community recreation.
IMPACT: • Noise and Vibration: Occupants in nearby buildings, particularly the Engineering Building, should expect intermittent noise and vibrations from demolition and heavy equipment during work hours.
• Construction Traffic: Increased presence of construction vehicles and personnel around SW 4th Avenue.
• Dust and Odors: Occasional dust or odors may occur during the clearing of hard surfaces and infrastructure work.
• Work Hours: Construction activity will typically occur during standard daytime hours to minimize disruption.
ACCESSIBILITY IMPACTS: • Sidewalk Obstructions: Periodic staging of equipment may impact pedestrian flow on the west side of SW 4th Avenue.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Anthony Moreschi |
503.502.5713 |
more...@pdx.edu |
| Quinn Soifer | 541.908.0664 | soi...@pdx.edu |
| |
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407
Work Control Center
Facilities and Property Management
202 University Services Building
617 SW Montgomery
Portland, OR 97201
Phone: 503-725-2FIX
Email: 2F...@pdx.edu
Click Here for the Work Control Center Online
~ Supporting Student Success ~