LOCATION: Campus Wide, Parking Structure 1 (PS1)
DURATION: 9/2/2025 to 9/26/2025
PROJECT INFORMATION: Contractor is installing permanent fencing around the exterior perimeter of the 8th floor of Parking Structure 1.
PROJECT BENEFITS: Installing fencing will help improve the safety of all occupants.
IMPACT: The 7th and 8th floors of PS1 will be closed to vehicle traffic.
Egress on the sidewalks immediately around PS1 will be impaired. Contractor will have staff on the sidewalks stopping pedestrian traffic as needed for overhead work. Reference attached map for alternate routes.
ACCESSIBILITY IMPACTS: 7th and 8th floors of PS1 will be closed to vehicle traffic.
Egress on the sidewalks immediately around PS1 will be impaired. Contractor will have staff on the sidewalks stopping pedestrian traffic as needed for overhead work. Reference attached map for alternate routes.
PROJECT COORDINATORS:
NAME | PHONE | |
---|---|---|
Joseph Wuest |
850-293-1010 |
jwu...@pdx.edu |
Quinn Soifer |
503-725-4316 |
soi...@pdx.edu |
|
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407