LOCATION: Richard and Maurine Neuberger Center (RMNC)
DURATION: 11/10/2025 from 6:30:00 AM to 5:00:00 PM
PROJECT INFORMATION: UPDATED - The two main building Air Handling Units (AHU-01 & 02) will be fully replaced as a part of this project. This project will have multiple impacts throughout it's duration that include three crane picks, brief electrical shut downs and impacts to the building's Heating Ventilation and Cooling Systems (HVAC). Future impact notices will be sent out to communicate all project impacts as they come up and in greater detail.
11/10 - Building-wide shut down of heating hot water (HHW), drain down of system to install HHW isolation valves.
PROJECT BENEFITS: To replace two aging Air Handler Units that are beyond their useful life. This project will improve occupant comfort by improving airflow, making the building's HVAC system more reliable and maintainable.
IMPACT: Monday 11/10, 6:30 am-5pm . During the shut down, AHU-01 Lower Parking, Upper Parking, 1st Floor, 2nd Floor, 3rd Floor and 8th Floor will not be provided with heating or ventilation until the system is restarted. Occupants on these floors, particularly on Floors 1st-3rd, may experience cooler temperatures at these times, and should consider bringing additional clothing layers.
AHU-02 zones (4th-7th Floor, 9th Floor) should not be affected.
ACCESSIBILITY IMPACTS: Elevator 80 will be unavailable during short periods of time, and building users will need to use an alternative elevator.
PROJECT COORDINATORS:
| NAME | PHONE | |
|---|---|---|
| Matt Gall |
503-725-6289 |
m...@pdx.edu |
| Steve Rounds |
503-869-4334 |
sro...@pdx.edu |
| |
|
|
ADDITIONAL INFORMATION:
If the above coordinator(s) are unavailable, please contact: 503-725-3738
Emergencies call Campus Public Safety: 503-725-4407