You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to News and Announcements
As you may already be aware, the following roads are part of the annual roads and sidewalk restoration program and will have detours in place during construction starting Monday, September 22nd beginning at the intersection of Great Pond Road and Osgood Street:
Great Pond Road: Osgood Street to Bradford Street
Great Pond Road: 1116 Great Pond Road to Essex Street
Morningside Lane: Winter Street to Russett Lane
Great Pond Road: Marbleridge Road to Fox Hill Road
The following roads will have road closures in place during construction:
Pond Street: Bradford Street to Town Line
Gray Road: Boston Street to Town Line
The following roads will be open to through traffic only:
Ferncroft Circle: South Bradford Street to Cul-de-sac
Bridle Path: Great Pond Road to Cul-de-sac
Pleasant Street: Fox Hill Road to Great Pond Road
Traffic delays, and raised castings should be expected if travelling within these areas. A town representative will be on site during construction. We appreciate your understanding. For any questions, please do not hesitate to reach out to the engineering department. Thank you.