Annual Roads and Sidewalk Restoration Program

3 views
Skip to first unread message

Sarah Brush

unread,
Oct 5, 2025, 12:45:21 PMOct 5
to News and Announcements

As you may already be aware, the following roads are part of the annual roads and sidewalk restoration program and are scheduled for paving work, weather permitting, starting the week of Monday, October 6th in the order of:

  • Pond Street: Town Line to Bradford Street
  • Great Pond Road: Bradford Street to Osgood Street
  • Great Pond Road: 1116 Great Pond Road to Essex Street
  • Morningside Lane: Russett Lane to Winter Street
  • Ferncroft Circle: South Bradford Street to Cul-de-sac
  • Bridle Path: Great Pond Road to Cul-de-sac
  • Great Pond Road: Marbleridge Road to Fox Hill Road
  • Gray Street: Boston Street to Town Line
Work on Pond Street is scheduled to be an early start to accommodate safety and high traffic volume at the intersection of Great Pond Road and Bradford Street.

Traffic delays, detours and raised castings should be expected if travelling within these areas. A town representative will be on site during construction. We appreciate your understanding. For any questions, please do not hesitate to reach out to the engineering department. Thank you.

great pond road 1 (1).jpg
great pond road 2 (1).jpg
pond street (1).jpg
--
Reply all
Reply to author
Forward
0 new messages