Project Construction Update
June 1, 2026
What's New?
-
This summer, June through August 2026, the contractor anticipates the following construction and site preparation activities throughout the project corridor on Route 114 between Willow Street and Waverly Road:
- Continued site preparation activities at properties slated for demolition at the intersection of Route 114 and Hillside Road, including installation of temporary construction fencing and related preparation work at 582, 591, 599, and 607 Turnpike Street. Demolition activities are expected to begin in mid-to-late July.
- Installation and maintenance of erosion control, sediment control, and stormwater protection measures in advance of and alongside upcoming work activities.
- Test pitting (soil sampling and utility investigation) at various locations on Route 114 throughout the corridor are anticipated to start this June and continue through September.
- Route 114 center median removal and temporary paving at intersections throughout the corridor are expected to start this July and continue through September. Temporary traffic control devices will be placed in lieu of the median.
-
Utility coordination and field verification activities, including coordination with utility companies and confirmation of existing utility locations in advance of future utility work.
- Saw cutting of roadway surfaces to support utility installation is expected to begin in June.
- Construction signage will remain in place and may be adjusted as needed to support shifting work areas and maintain safe travel through the corridor.
- Material deliveries to project work sites and active work zones.
When is this Work Happening?
- Work activities are scheduled to continue on weekdays, Monday - Friday, during the summer construction season.
- Work hours are from 7:00 a.m. to 3:00 p.m.
How Will this Affect You?
- Lane shifts, traffic control devices, and police details may be required on Route 114 in the project limits to support these activities for public and worker safety.
- Access for pedestrians and emergency services will be maintained.
- Drivers traveling through the affected areas should expect delays, reduce speed, and use caution.
Stay Connected:
- For more information on the Route 114 Corridor Improvements in North Andover, please visit our website at this link.
- To reach the project team, please email NorthAndov...@dot.state.ma.us or call the project hotline phone number at (978) 906-8694.
- If you have been forwarded this email, and would like to receive project updates and traffic advisories, please subscribe for updates here.
|