IMPACT: Network services will be impacted for about 12 minutes in floors/areas served by the switches.
DESCRIPTION: Per manufacturer's recommendation, switches in the above location will be upgraded to a new version. The existing software (Junos OS) is reaching the End of Support.
SCOPE: Switch Replacement - Floor D; Hildebrand Hall
IMPACT: WiFi services will be impacted during the maintenance window.
DESCRIPTION: A member switch providing connections to some wireless access points in floor D, Hildebrand Hall is showing signs of failure. To forestall unplanned outage, the defective switch will be proactively replaced.