| | Hi,
From the first
click to the final placement, we're with you every step of the way. - You don’t need to wait. Delaying replacement often costs more in the long run with repeat maintenance/emergency replacements.
- You don’t need road closures. InQuik installs over running water or live traffic with minimal disruption, improving worker and environmental safety.
- You don’t need massive crews or cranes. Lightweight panels and modular design allow for installation with small crews and an excavator/small crane.
- You don’t need to compromise durability. It's an HL-93 load rated, AASHTO-LRFD approved, reinforced concrete structure.
- You don’t need to figure it out alone. Stamped shop drawings, P.E. support, and on-site reps at install.
Whether you’re facing site limitations, tight budgets, or tough timelines, we’re here to help you get it done. | | | Let’s talk. We’ll build out a no-pressure project estimate and help you assess if InQuik fits your goals. | | |
|
|