Let's replace your bridge in record time.

1 view
Skip to first unread message

InQuik Bridge Systems

unread,
2:59 PM (5 hours ago) 2:59 PM
to shad...@co.larimer.co.us
CMC
Hi,

From the first click to the final placement, we're with you every step of the way.
  • You don’t need to wait. Delaying replacement often costs more in the long run with repeat maintenance/emergency replacements.
  • You don’t need road closures. InQuik installs over running water or live traffic with minimal disruption, improving worker and environmental safety. 
  • You don’t need massive crews or cranes. Lightweight panels and modular design allow for installation with small crews and an excavator/small crane.
  • You don’t need to compromise durability. It's an HL-93 load rated, AASHTO-LRFD approved, reinforced concrete structure.
  • You don’t need to figure it out alone. Stamped shop drawings, P.E. support, and on-site reps at install.
Whether you’re facing site limitations, tight budgets, or tough timelines, we’re here to help you get it done. 
 

Let’s talk. We’ll build out a no-pressure project estimate and help you assess if InQuik fits your goals.

cmc.com
 
  Facebook   Instagram   LinkedIn   YouTube
This email was sent to shad...@co.larimer.co.us. If you'd like to unsubscribe or update your preferences, please click here.


CMC
6565 North MacArthur Blvd, Suite 800
Irving, TX 75039 USA
Reply all
Reply to author
Forward
0 new messages