Account Options

  1. Sign in
The old Google Groups will be going away soon, but your browser is incompatible with the new version.
Google Groups Home
« Groups Home
time is not tracked if I hit "enter" in the tracking dialog for a task
There are currently too many topics in this group that display first. To make this topic appear first, remove this option from another topic.
There was an error processing your request. Please try again.
flag
  2 messages - Collapse all  -  Translate all to Translated (View all originals)
The group you are posting to is a Usenet group. Messages posted to this group will make your email address visible to anyone on the Internet.
Your reply message has not been sent.
Your post was successful
 
From:
To:
Cc:
Followup To:
Add Cc | Add Followup-to | Edit Subject
Subject:
Validation:
For verification purposes please type the characters you see in the picture below or the numbers you hear by clicking the accessibility icon. Listen and type the numbers you hear
 
rogerdpack  
View profile  
 More options Jun 12 2012, 3:30 pm
From: rogerdpack <rogerdp...@gmail.com>
Date: Tue, 12 Jun 2012 12:30:22 -0700 (PDT)
Local: Tues, Jun 12 2012 3:30 pm
Subject: time is not tracked if I hit "enter" in the tracking dialog for a task

Hello all.
First time here, so let me know there's a better place to report this.
Currently with our team's V1 (www5.v1host.com/FH-V1), if I go to
TaskBoardPage, create a new task for a story (assign it to myself), don't
set an estimate for it, then click ok (or refresh the TaskBoardPage), it
shows up without an estimate, which is expected.  Then if I click its drop
down arrow, then click "track", then fill in number, for instance just a
0.5 in "To Do" then hit enter while still in that field.  
I would expect it to update the dialog, with the new number.  Instead, it
appears to dismiss the dialog, and basically ignores the numbers I
entered.  Entering numbers then clicking "ok" works as expected, however.  
This bites me every so often, and I would love to see it addressed.
Cheers!
-roger-


 
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Mark C.  
View profile  
 More options Jun 27 2012, 9:51 am
From: "Mark C." <mcr...@alumni.nd.edu>
Date: Wed, 27 Jun 2012 06:51:23 -0700 (PDT)
Local: Wed, Jun 27 2012 9:51 am
Subject: Re: time is not tracked if I hit "enter" in the tracking dialog for a task

Roger,

This sounds like a potential defect. Potential defects should be reported
directly to versionone support using the support@ email address.

- Mark


 
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
End of messages
« Back to Discussions « Newer topic     Older topic »