Alpstein fork: RMPath problems

108 views
Skip to first unread message

Jan Christiansen

unread,
Feb 19, 2012, 5:35:47 AM2/19/12
to route-...@googlegroups.com
Hi,

I am currently checking out the Alpstein fork of route-me and observed an odd behavior with respect to paths. I draw a simple path consisting of two points and when zooming in it looks like the path is first drawn with different coordinates before it is finally drawn at the correct position. Therefore, the path is kind of jumping around.

Even if I do not zoom in the position property of the corresponding annotation is first set to the CGPoint

(15913.927, -28848.4766)

before it is set to the point

(184.927795, 270.523041)

although I am not moving the map. The first position looks quite odd to me.

I am also asking myself whether this behavior might be the reason why I occasionally get the warning

Ignoring bogus layer size

Can somebody tell me whether this is a known bug or it is even a desired behavior?

Thanks, Jan

Chris James

unread,
Mar 23, 2012, 4:08:58 PM3/23/12
to route-...@googlegroups.com
I have noticed this problem as well, and also with markers.

Chris

Jan Christiansen

unread,
Mar 25, 2012, 3:10:39 PM3/25/12
to route-...@googlegroups.com

On Mar 23, 2012, at 9:08 PM, Chris James wrote:

> I have noticed this problem as well, and also with markers.

Thanks for the confirmation. Meanwhile I have opened an issue at github https://github.com/Alpstein/route-me/issues/29. As mentioned there, I think I have tracked down at least a part of the problem. I plan to check whether I can fix the bug in the upcoming week.

Cheers, Jan

Reply all
Reply to author
Forward
0 new messages