Yesterday the Galibier was 2645m
http://bit.ly/qEK6dt
Today it's only 2556m
http://bit.ly/nEZ7NT
DR
Chinese mining company harvesting rare earth elements?
Ah! They're using the tunnel!
Yes you could see where the tunnel was lower than the finish
yesterday. Our chinese overlords won't be happy about this.
> Yes you could see where the tunnel was lower than the finish
> yesterday.
Yup. Been there. It's almost directly under the summit. I just didn't
realize they would use it.
DR
Travesty. Those last hairpins above the tunnel on both sides are the
best. This was the first time since both the road and the tunnel were
accessible (2002) that they opted for the tunnel. (Before 1974 there was
only the tunnel, between 1974 and 2002 the tunnel was closed.)
That is because it is.
Did you see them ride
through a tunnel yesterday?
--
Old Fritz