Rajashree Rajagopal
5/17/12
PLD-2 slots re-adjustment
Dear PLD-2 AUs, As per the originally planned schedule, following was the order of slots booked on
unread,
PLD-2 slots re-adjustment
Dear PLD-2 AUs, As per the originally planned schedule, following was the order of slots booked on
5/17/12
seeraz nawaz
1/31/17
Authorization mail
Dear All, Ajay Jha (132120003) is an authorized user on PLD-II System -- With Regards Seeraz Nawaz Ph
unread,
Authorization mail
Dear All, Ajay Jha (132120003) is an authorized user on PLD-II System -- With Regards Seeraz Nawaz Ph
1/31/17
manisha kamble/bansode
9/15/16
Update on of PLD _meeting
Dear All, Following are the Update on PLD meeting. 1) Sound from rotator of the PLD II : Getting
unread,
Update on of PLD _meeting
Dear All, Following are the Update on PLD meeting. 1) Sound from rotator of the PLD II : Getting
9/15/16
manisha kamble/bansode
8/22/16
Re: Minutes of PLD _meeting
Dear all, Following are the minutes of the meeting. 1) Sound from rotator of the PLD II 2) Sound from
unread,
Re: Minutes of PLD _meeting
Dear all, Following are the minutes of the meeting. 1) Sound from rotator of the PLD II 2) Sound from
8/22/16
Pragati chaturvedi
,
manisha kamble/bansode
2
8/19/16
Status of PLD Laser box
Dear Pragati, PLD system will be UP after the Monday meeting. Regards, Manisha On Fri, Aug 19, 2016
unread,
Status of PLD Laser box
Dear Pragati, PLD system will be UP after the Monday meeting. Regards, Manisha On Fri, Aug 19, 2016
8/19/16
manisha kamble/bansode
8/19/16
Reg PLD _meeting
Dear All, Monday 22 August 2016 at 11:15am there will be meeting in Micro-electronics conference room
unread,
Reg PLD _meeting
Dear All, Monday 22 August 2016 at 11:15am there will be meeting in Micro-electronics conference room
8/19/16
seeraz nawaz
,
Satyavalli Paluri
2
7/20/16
Authorization mail
Dear Seeraz, There is no entry for 'AUTHORIZATION' in the eqp training module : http://www.
unread,
Authorization mail
Dear Seeraz, There is no entry for 'AUTHORIZATION' in the eqp training module : http://www.
7/20/16
seeraz nawaz
5/24/16
Authorization mail
Dear all, Hem Shruti Bharatwaj is authorized to use PLD-II. -- With Regards Seeraz Nawaz Ph.D Student
unread,
Authorization mail
Dear all, Hem Shruti Bharatwaj is authorized to use PLD-II. -- With Regards Seeraz Nawaz Ph.D Student
5/24/16
Pragati chaturvedi
5/1/16
PLD I- gate valve not working
Dear Ma'am, Gate valve of PLD I is not working. Please look into this as soon as possible. Thanks
unread,
PLD I- gate valve not working
Dear Ma'am, Gate valve of PLD I is not working. Please look into this as soon as possible. Thanks
5/1/16
Pragati chaturvedi
1/27/16
Need Program Controller :PLD I
Dear Bhimraj and Sushil, My PLD I slot is starting from 28th Jan. Please put the program controller
unread,
Need Program Controller :PLD I
Dear Bhimraj and Sushil, My PLD I slot is starting from 28th Jan. Please put the program controller
1/27/16
Pragati chaturvedi
,
bhimraj sable
3
1/8/16
PLD I program controller
Dear Sir, PLD 1 program controller has been swapped. On Jan 8, 2016 10:35 AM, "Sushil Aher"
unread,
PLD I program controller
Dear Sir, PLD 1 program controller has been swapped. On Jan 8, 2016 10:35 AM, "Sushil Aher"
1/8/16
seeraz nawaz
2
1/4/16
PLD-II heater not working
Dear All, The problem is found in the program controller of PLD-II heater. So for time being the
unread,
PLD-II heater not working
Dear All, The problem is found in the program controller of PLD-II heater. So for time being the
1/4/16
seeraz nawaz
,
neha raorane
2
8/24/15
PLD-II is up
Dear Seeraj, Kindly remove my name from PLD group. Regards, Neha Nano LIC On Mon, Aug 24, 2015 at 10:
unread,
PLD-II is up
Dear Seeraj, Kindly remove my name from PLD group. Regards, Neha Nano LIC On Mon, Aug 24, 2015 at 10:
8/24/15
seeraz nawaz
,
Satyavalli Paluri
2
8/4/15
Authorization Mail
Dear Seeraz, There is no 'authorization' entry made in the training module. Pl get this done
unread,
Authorization Mail
Dear Seeraz, There is no 'authorization' entry made in the training module. Pl get this done
8/4/15
Neeraj Panwar
2
4/28/15
Leave Intimation
Dear All, I extended my leave up to 1st of may 2015. Thanks. On Mon, Apr 13, 2015 at 2:13 AM, Neeraj
unread,
Leave Intimation
Dear All, I extended my leave up to 1st of may 2015. Thanks. On Mon, Apr 13, 2015 at 2:13 AM, Neeraj
4/28/15
seeraz nawaz
2/25/15
Shifting of PLD slot
Dear All, Whoever has booked the slot of PLD system from today on wards please shift your slots for 2
unread,
Shifting of PLD slot
Dear All, Whoever has booked the slot of PLD system from today on wards please shift your slots for 2
2/25/15
manisha kamble/bansode
2/23/15
Rules and regulations
Dear All, Please follow the rules given below while using PLD system for smooth operation. 1. Keep
unread,
Rules and regulations
Dear All, Please follow the rules given below while using PLD system for smooth operation. 1. Keep
2/23/15
neha raorane
7/8/14
Consumables of PLD at Nano lab
Dear all, Please collect all the consumables of PLD from Nano lab to avoid any misplacement.
unread,
Consumables of PLD at Nano lab
Dear all, Please collect all the consumables of PLD from Nano lab to avoid any misplacement.
7/8/14
sourabh jain
, …
Satyavalli Paluri
5
6/10/14
Fwd: Problem in PLD II heater
Dear Pradeep, Thanks very much to your team for taking care of this on fast track basis. Thanks &
unread,
Fwd: Problem in PLD II heater
Dear Pradeep, Thanks very much to your team for taking care of this on fast track basis. Thanks &
6/10/14
Neeraj Panwar
,
Satyavalli Paluri
2
6/3/14
PLD-1 is up for use
Dear all, The PLD box through which the LASER passes, is very dirty. Request the SOs to take
unread,
PLD-1 is up for use
Dear all, The PLD box through which the LASER passes, is very dirty. Request the SOs to take
6/3/14
Neeraj Panwar
5/25/14
PLD is not working
Dear All, PLD is not working due to problem in heater. Thanks,. -- Neeraj Panwar CEN, IIT Bombay
unread,
PLD is not working
Dear All, PLD is not working due to problem in heater. Thanks,. -- Neeraj Panwar CEN, IIT Bombay
5/25/14
Saurabh nagar
5/21/14
Documents
Hi, Did you receive the Documents which I have sent earlier? If not, I have re-uploaded them on my
unread,
Documents
Hi, Did you receive the Documents which I have sent earlier? If not, I have re-uploaded them on my
5/21/14
Neeraj Panwar
4/3/14
Authorization Mail
Dear All, Cijy Mathai is now authorized user of PLD 1. Thanks ! -- Neeraj Panwar CEN, IIT Bombay
unread,
Authorization Mail
Dear All, Cijy Mathai is now authorized user of PLD 1. Thanks ! -- Neeraj Panwar CEN, IIT Bombay
4/3/14
sourabh jain
,
rajendra prasad vanaparthy
2
3/12/14
Re: IIT Bombay: Courtesy checking of Compex pro 201 F S/N- GEP.1115129.10001
Dear Pradeep, Ensure work permit form is filled for this. Thanks & Regards, V.RAJENDRA PRASAD +91
unread,
Re: IIT Bombay: Courtesy checking of Compex pro 201 F S/N- GEP.1115129.10001
Dear Pradeep, Ensure work permit form is filled for this. Thanks & Regards, V.RAJENDRA PRASAD +91
3/12/14
Saurabh nagar
, …
vanap...@ee.iitb.ac.in
3
3/12/14
Regarding Fuse for PLD Heater
FYA.............. -- Thanks & Regards, V.RAJENDRA PRASAD > Dear Sunitha, > > We need 5
unread,
Regarding Fuse for PLD Heater
FYA.............. -- Thanks & Regards, V.RAJENDRA PRASAD > Dear Sunitha, > > We need 5
3/12/14
sourabh jain
2/25/14
PLD is up for usage
Dear All, PLD is up for the usage as the LASER is working fine now. It can be operate in both HV-N
unread,
PLD is up for usage
Dear All, PLD is up for the usage as the LASER is working fine now. It can be operate in both HV-N
2/25/14
neha raorane
2
2/6/14
Fwd: purchase order no.201301804
Dear Sir, We have received order acknowledge and bank details from vendor. Wire transfer will be done
unread,
Fwd: purchase order no.201301804
Dear Sir, We have received order acknowledge and bank details from vendor. Wire transfer will be done
2/6/14
neha raorane
1/23/14
Status of LCB procurement
Dear Sir, The PO processing for Laser control board has started. As per the conditions of Coherent we
unread,
Status of LCB procurement
Dear Sir, The PO processing for Laser control board has started. As per the conditions of Coherent we
1/23/14
neha raorane
2
12/17/13
Re: Laser issue not solved
Dear all, Engineer from Laser Science has checked laser today. It is not working. Checks performed
unread,
Re: Laser issue not solved
Dear all, Engineer from Laser Science has checked laser today. It is not working. Checks performed
12/17/13
Neeraj Panwar
12/3/13
Re: PLD Laser
Dear All, There is a software problem in LASER of PLD systems. Please don't plan your process
unread,
Re: PLD Laser
Dear All, There is a software problem in LASER of PLD systems. Please don't plan your process
12/3/13
sourabh jain
,
neha raorane
4
11/19/13
LASER issue
Dear All, Halogen filter of the LASER is replaced and filter ration is set to 0%. Laser can be used.
unread,
LASER issue
Dear All, Halogen filter of the LASER is replaced and filter ration is set to 0%. Laser can be used.
11/19/13