Sum up the time in a certain view
There are currently too many topics in this group that display first. To make this topic appear first, remove this option from another topic.
There was an error processing your request. Please try again.
flag
  5 messages - Collapse all  -  Translate all to Translated (View all originals)
The group you are posting to is a Usenet group. Messages posted to this group will make your email address visible to anyone on the Internet.
Your reply message has not been sent.
Your post was successful
 
From:
To:
Cc:
Followup To:
Add Cc | Add Followup-to | Edit Subject
Subject:
Validation:
For verification purposes please type the characters you see in the picture below or the numbers you hear by clicking the accessibility icon. Listen and type the numbers you hear
 
Christian Sachs  
View profile  
 More options Mar 29 2012, 1:54 pm
From: Christian Sachs <christian.sa...@cactus-competence.com>
Date: Thu, 29 Mar 2012 10:54:24 -0700 (PDT)
Local: Thurs, Mar 29 2012 1:54 pm
Subject: Sum up the time in a certain view
Hello Everyone,

is there a possibility to see a total of the time needed to accomplish
all the tasks in a certain view?
I have a todo view, where I have all the tasks shown that I need to do
today (Flag defined as do this week and starred) and I have a view
where all the tasks this week appear (Flagged as to do this week). In
order to decide, how much I can pack into the week and into my day it
would be very helpful, to have the sum of the task duration shown
somewhere, so that I can directly see, that 20 hours of work in a day
would not work out.
Today I do this with my calculator, which is time consuming and not
very easy to do.
Anyone with an idea how to solve?

Thank you very much in advance.


 
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Susanne Araf  
View profile  
 More options Mar 29 2012, 5:13 pm
From: Susanne Araf <susanne.a...@gmail.com>
Date: Thu, 29 Mar 2012 23:13:35 +0200
Local: Thurs, Mar 29 2012 5:13 pm
Subject: Re: [MLO] Sum up the time in a certain view
You can do a print preview, where it shows you the total time required
for all tasks in a view, probably easier than to use your calculator.

Am 29.03.2012 19:54, schrieb Christian Sachs:


 
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Christian Sachs  
View profile  
 More options Mar 30 2012, 1:47 am
From: Christian Sachs <christian.sa...@cactus-competence.com>
Date: Thu, 29 Mar 2012 22:47:13 -0700 (PDT)
Local: Fri, Mar 30 2012 1:47 am
Subject: Re: Sum up the time in a certain view
Thanks a lot, this is a least a good work-around which I was not aware
of, as I never do prints.

 
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
chuckdevee  
View profile  
 More options Mar 30 2012, 6:21 am
From: chuckdevee <don_sm...@me.com>
Date: Fri, 30 Mar 2012 03:21:42 -0700 (PDT)
Local: Fri, Mar 30 2012 6:21 am
Subject: Re: Sum up the time in a certain view

thanks for this..funny, that little change, being able to see a total
time for tasks in view, has opened up a whole new aspect of MLO for
me.. never used the task times before as it was just too much detail,
but I can see the benefit now if it enables me to judge how much time
my tasks in view are expected to take up..


 
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Jon  
View profile  
 More options Apr 7 2012, 3:17 pm
From: Jon <iguat...@gmail.com>
Date: Sat, 7 Apr 2012 12:17:08 -0700 (PDT)
Local: Sat, Apr 7 2012 3:17 pm
Subject: Re: [MLO] Sum up the time in a certain view

I'm impressed that MLO can generate this kind of information!

Now it would just be nice if the next version could serve it up in a way
that is more accessible. Say one of the "instant" summaries, like it does
with the number of tasks contained in a view.


 
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
End of messages