MLO-Desktop version 1.9.9 beta-4 has been released. FILTERING!

13 views
Skip to first unread message

Andrey Tkachuk (MLO)

unread,
Dec 24, 2007, 12:27:44 PM12/24/07
to MyLifeOrganized
Hi All,

Internal beta testing of new filtering functionality in MLO-Desktop
has been successfully completed. The beta has been released to public.
Please note that this is NOT a final version. Use it at your own
risk.

Download, unzip and run this beta version if you would like to test/
review new functionality and provide your feedback before final
release. It is much easier to change functionality while MLO is in
beta so your feedback and findings are appreciated.

The link:
http://www.mylifeorganized.net/downloads/files/beta/mlo_beta.zip

The change log:
- feature: advanced filtering on To-Do tab
- change: improved behavior of tasks on ToDo with HideInToDo option
when "Complete subtasks in order" is used.
- change: "Places" renamed to "Contexts"
- change: <no where> renamed to (none)
- change: <all places> renamed to (all)
- change: AutoUpdate option for ToDo tab moved to the local menu


Additional notes about this release:

1) There are three default views created for you by default on To-Do
list:
- "Active Tasks" - the same view as used in previous versions of MLO
- "Active Tasks by Contexts" - the same as above but groupped by
Context
- "Next Actions by Projects" - single Next Action for each project is
added to To-Do list

You can also create any view you need using filtering functionality.


2) What is "Action Filter" on To-Do tab?
There is new filter control the on the Filter panel - "Action
Filter".
Here is the explanation of its values:

"Active" - the ToDo list will contain the task according as it worked
in previous MLO versions. Additional filter might be also applied to
the list.

"Available" - the same as "Active" with the only exception that
"Complete subtasks in order" option is not considered when building
ToDo list. So you might see all available tasks.

"Next Actions" - only one (first) task from each project will be
placed on ToDo list. If a task does not correspond to any project the
top level parent task is considered as its project.

"Completed" - place all completed tasks on ToDo list

"All" - place all tasks on ToDo list.


As I said additional filter could be applied to the list after "Action
Filter" is applied. This way you can create almost any type of lists
on your ToDo now.


3) The filter/views settings are stored in temporal file for now. The
file name is <YourDataFileName>.mflt. This is done to not change the
data file format while we in beta


4) The position of filtering UI controls are not saved to the file
yet.


5) In the dialog "Setup advanced filtering" the values for fields with
string (text) type should be taken in single quotation marks. Example:
Caption contains 'Urgent:'
Notes starts with 'Test text to start note with'


Do you like it?

Andrey.


Andrey Tkachuk

unread,
Dec 24, 2007, 12:34:40 PM12/24/07
to MyLifeOrganized
Some screenshots.
MLOFilter1.gif
MLOFilter3.gif
MLOFilter2.gif

Andrey Tkachuk (MLO)

unread,
Dec 27, 2007, 2:21:52 PM12/27/07
to MyLifeOrganized
The beta-5 has been released

The same link:
feature: Outlook sync can use any of your ToDo views now. Just select
option "Remove tasks from Outlook not visible in MLO To-Do View" in
advanced Outlook sync options dialog. Then select a View Name. This
way for example you can create a View of your Private tasks and sync
only them to Outlook. Please note that "Priority mapping" does not
show correct priority in Outlook after sync at the moment. We are
working on it.

change: changed the functionality of populating UDF field "Project"
for GTD AddIn.

change: default To-Do views renamed from "Active Tasks ..." to "Active
Actions ...".

bugfix: fixed error when grouping by context raised an exception after
deletion of a context sometimes



Andrey Tkachuk (MLO)

unread,
Jan 7, 2008, 9:49:33 AM1/7/08
to MyLifeOrganized
The beta-6 has been released
change: Project groups are sorted by project importance first and then
(if it is equal) by project name
feature: Added new grouping by "Parent" and by "Top Level
Parent" (zoom considered, sorted by importance first and name then)
feature: "ProjectName" text field added to advanced filtering
feature: Added operation selector for Contexts section in the filter
(AND/OR)
change: Added warning for users of MLO Standard edition that Advanced
Filtering will not be available in this Edition
bugfix: Fixed "Close round expected" error in filter if your regional
settings not English.
bugfix: Minor bugfixes

Andrey Tkachuk (MLO)

unread,
Feb 4, 2008, 11:21:01 AM2/4/08
to MyLifeOrganized
The beta-7 has been released
change: changed the behavior of TO-DO View settings
bugfix: Minor bugfixes

Now if you change settings for current To-Do view it marked as
modified by adding "*" to the view name: "*View Name". If you want to
save new settings for this view you should click "Save Settings..."
and enter the same (or another) name. If you want to revert to
previous settings you should click "Reset Settings". If you close MLO
data file the unsaved modifications for views will be lost.