Account Options

  1. Sign in
The old Google Groups will be going away soon, but your browser is incompatible with the new version.
Google Groups Home
« Groups Home
mozilla . dev . apps . calendar
This is a Usenet group - learn more
Find or start a Google Group about calendar.
Group info
Group categories: Not categorized
More group info »
Discussions
View:  Topic list, Topic summary Topics 1 - 10 of 1636  Older »

Release schedule of Lightning 1.9.2 ? 
  Hi, what is the time schedule of the Lightning 1.9.2 bugfix release? Are there open bugs that need help to fix or verify? Maybe there exists an unofficial list somewhere because I failed to find them in bugzilla whiteboard search. Stefan
By Stefan Sitter  - Apr 23 - 4 new of 4 messages    

Odd Reminder Behavior 
  ... That's good to hear. Thanks! (And it's encouraging to hear that there is a "team". :-) ) I'm not getting this problem with my same calendars on my Android 4.1.2 phone, and there hasn't been an Android update for my phone in months. So this seems to indicate that the problem might be with Lightning.... more »
By Peter Lairo  - Apr 11 - 7 new of 7 messages    

Lightning export to CSV...??? 
  Hi all, I just started transferring all of my historical calendar data from an ancient program manually - 10 years worth (no export), and tried to backup my newly entered stuff to a CSV file. Only when I opened it up in Excel, I found that only a small fraction of the data had actually been backed up (no description text, no completed events, etc). From everything I have read, the lightning export is just a dump of everything entered. The CSV file, as I see it in Excel, is basically useless as a backup. Am I missing something? Please Help! Thanks.... more »
By public424...@comcast.net  - Mar 21 - 1 new of 1 message    

Status of 1.9.1 
  I was under the impression that lightning 1.9.1 was going to be released soon, is that still the case? -- Orion Poplawski Technical Manager 303-415-9701 x222 NWRA, Boulder Office FAX: 303-415-9702 3380 Mitchell Lane or...@nwra.com... more »
By Orion Poplawski  - Mar 19 - 4 new of 4 messages    

Google Calendar Caldav support dropped? 
  For a some time it's been recommended to use CalDAV for Google Calendar. But in the light of [link] it seems, that Google is closing CalDAV access. Does that mean, that now Provider for Google Calendar should be used instead?... more »
By Virgo Pärna  - Mar 14 - 22 new of 22 messages    

Lightning 2.4a1 missing Check boxes for Calendars 
  I noticed my calendar check boxes missing in the calendar tab after the update to Thunderbird Daily on 08-03-2013 with the new grain background for the Folder pane. <[link]> Still the same after yesterday's updates to Thunderbird and Lightning.... more »
By WaltS  - Mar 10 - 6 new of 6 messages    

Lightning nightly for Thunderbird daily version 22.0a1 - No auto-update? 
  Thunderbird daily just updated to version 22.0a1. Lightning trunk did *not* auto-update (2.3a1 to 2.4a1), even though bug 808668 was fixed on 14.02.2013 and I am reasonably sure I had (manually) installed Lightning trunk[1] after that date. I had to download the new version of Lightning (2.4.a1) from the FTP server[1] and install it manually.... more »
By Peter Lairo  - Feb 20 - 8 new of 8 messages    

Lightning 2.1b1 on amo without translations 
  Hi, I just want to point out that Lightning 2.1b1 on amo comes with no translations at all. Since that's the version to use with SeaMonkey, there's a reason why no localisation has been included? Can we change that? Iacopo
By Iacopo Benesperi  - Feb 20 - 6 new of 6 messages    

Lightning 1.9.1 Release Candidate available for testing 
  Lightning 1.9.1 Release Candidate is available for testing. This is a bugfix release that works with Thunderbird 17.0 - 17.* and SeaMonkey 2.14 - 2.14.*. More information and download links can be found in the Mozilla Calendar Project Blog: [link]... more »
By Stefan Sitter  - Feb 18 - 1 new of 1 message    

calendar/lightning bug reports 
  I recently triaged thunderbird product bugs to make sure no calendar bugs were there. Then I took a look at product=calendar bugs, and surprised to see over 500 unconfirmed, and ~25 higher severity that have no activity in past year. Anyone interested in joining a calendar bugday, to clean a few of these,... more »
By Wayne  - Feb 11 - 3 new of 3 messages    

1 - 10 of 1636   « Newer | Older »

XML