We can but hope. I will believe it is happening when construction
starts. This project has drug on for so long that I view it with some
cynicism.
The existing Met. Station, IIRC is next to Canonbury Park. I doubt
many folks will be inconvenienced. Many, many more Metroland
residents will gain the benefit of a main line connection.
The existing Met. Station, IIRC is next to Cassiobury Park. I doubt
"1506" <adrian_a...@yahoo.com> wrote
>
>Was the old Watford High St to Croxley route ever formerly closed? I
>had the feeling that it had its serviced reduced until it could be
>replace by a bus.
It was eventually - after some time when it had been reduced to 1 train each
way a day, in the early morning. Then this was bustituted (according to the
timetable, but in practice taxistuted), and eventually formally closed. Even
after formal closure someone reported being able to buy a ticket to Croxley
Green out of a ticket machine somewhere.
Peter
That was back in March, and they were saying then that they were
aiming for a 2015 completion. The next barrier it has to overcome is
project entry status with the DfT which, if I remember, it is meant to
be in the process of attaining as we speak. I'll drop Herts an email
and see if they've got any news or dates associated with that yet.
John Bull
This is excellent news.
>The existing Met. Station, IIRC is next to Cassiobury Park. I doubt
many folks will be inconvenienced. Many, many more Metroland
residents will gain the benefit of a main line connection.
Will the Croxley Rail Link facilitate plans to re-extend the Bakerloo Line
from Harrow & Wealdstone to Watford Junction? What's going with that,
anyway?
AFIK extending the Bakerloo is fading back into obscurity. I don't
see any negative issues. But mixing tube with mainline and subsurface
stoke means that the platforms have to be compromise height. Better
in my view to keep the Bakerloo as is, and extend the East London Line.
AFIK extending the Bakerloo is fading back into obscurity. I don't
see any negative issues. But, mixing tube with mainline and
subsurface
stock means that the platforms have to be compromise height. Better
> AFIK extending the Bakerloo is fading back into obscurity. I don't
> see any negative issues. But mixing tube with mainline and subsurface
> stoke means that the platforms have to be compromise height. Better
> in my view to keep the Bakerloo as is, and extend the East London Line.
That didn't seem to be a problem for the 65 years (1917-1982) that the
Bakerloo ran to Watford Junction. And of course it remains the situation
from Queens Park to Harrow & Wealdstone.
Peter Beale
That's true, but we have a more enlightened attitude to disabled
passengers than our predecessors, so it isn't persuasive.
--
http://gallery120232.fotopic.net/p13857135.html
(09 025 at Brighton, 20 Apr 1996)
But all the platforms north of Harrow are still at compromise height,
with a step down from the 313s. Any provision for disabled passengers
could be taken into account by having a raised section in the northern
end of the platforms where the LO services stop and a lowered section
at the southern end, where only the Bakerloo line trains would have
doors; these short sections would have to be in the same spot at each
station and could line up with the areas of the trains with wheelchair
spaces etc.
Such raised sections have already started to appear on the Victoria
line, as part of the upgrade. It's quite unusual not having to step
down from the train.
Not only the Victoria line, they're appearing at other stations on the
LU network as well - the Northern line at London Bridge sticks in my
mind, but there are other places too.
Of course, I knew I'd seen one somewhere else, but I couldn't remember
where!!
So if disabled can't be accomodated then the best solution is that no one is?
Is that what you're saying?
B2003
Presumbably the raised lumps are mostly likely to appear at stations
served by the JLE, since those would have been made accessible
anyway. Anywhere else, there would be little chance of reaching the
platform in the first place.
On the Bakerloo thing, the platforms are at compromise height which
according to my impression is slightly less of a step up from the
Bakerloo than a step down from a 313. Has anyone got measurements to
confirm this?
More that the disabled will never be accommodated and will continue to
be ignored unless new works have to meet certain standards. There are
centuries of precedent for this and they've had enough. Sometimes the
requirements seem to go too far, but I understand why.
No, because the JLE stations already have the train floor level with
the platforms, so there is no step up or down into the train. The
raised areas will be needed on the original Jubilee line though.
> On the Bakerloo thing, the platforms are at compromise height which
> according to my impression is slightly less of a step up from the
> Bakerloo than a step down from a 313. Has anyone got measurements to
> confirm this?
I think it depends on the station and any cant at the location.
On the Rayners Lane to Uxbridge line, which also has compromise
platform heights, and used to only have a limited Piccadilly service,
it is my impression that the gap is larger stepping up from a
Piccadilly line train than down from a Met line train.
I meant that at a station like London Bridge, the lumps were needed to
make the Northern Line platforms usable, but there would have been no
point unless the whole station had been made accessible for the JLE.
>
> > On the Bakerloo thing, the platforms are at compromise height which
> > according to my impression is slightly less of a step up from the
> > Bakerloo than a step down from a 313. Has anyone got measurements to
> > confirm this?
>
> I think it depends on the station and any cant at the location.
True. My impression was based on Kensal Green, which is straight and
level.
I don't believe I am saying that, no. I believe I'm saying that the
standards of the past, where such things were not taken into account, do
not apply today. And on checking, I find that is just what I wrote.
--
http://gallery120232.fotopic.net/p9683699.html
(51398 (Class 117) at Great Malvern, Jun 1985)
There is a more useful and cheaper alternative: that each railway be allowed
to open new inaccessible stations so long as the number of inaccessible
stations on that company's network gradually goes down. So if they opened up
a new branch with three stations where wheelchair access would be expensive,
relatively pointless or impossible, they could make up for it by making six
other stations wheelchair accessible elsewhere on the network where it was
cheaper and/or more useful. The current rules make certain new stations
financially unviable, helping neither the disabled nor the able bodied.
> There is a more useful and cheaper alternative: that each railway be allowed
> to open new inaccessible stations so long as the number of inaccessible
> stations on that company's network gradually goes down. So if they opened up
> a new branch with three stations where wheelchair access would be expensive,
> relatively pointless or impossible, they could make up for it by making six
> other stations wheelchair accessible elsewhere on the network where it was
> cheaper and/or more useful. The current rules make certain new stations
> financially unviable, helping neither the disabled nor the able bodied.
I presume you intend that suggestion to be taken with the same
seriousness as your inverted name.
--
http://gallery120232.fotopic.net/p9632852.html
(33 051 at Eastleigh, 1985)
Can you name a single potential new station that have been made
unviable by the accessibility rules? Wheelchair access doesn't add
much to the cost, if planned from the start, certainly compared to the
costs of modifying an existing station. If a potential spot is
unviable with the rules, then it is unlikely to have had a clear cut
case in the first place.
IIRC putting lifts in a brand new station in a cutting or on an embankment
approximately doubles the cost. Allowing passive provision for future lift
installation costs very little. With new stations in relatively quiet areas,
such as Eastfields, the cost of lifts could easily make or break the
business case for the station. The money spent on installing lifts at a
quiet station like Eastfields which already has a wheelchair-accessible
station next door at Mitcham Junction would have been much better spent on
installing lifts at a busier station in an area with no wh-acc station, such
as Tulse Hill or Peckham Rye. (Actually, Eastfields has level access to both
platforms, and the lifts are merely part of the footbridge over the level
crossing - an utterly ridiculous example of wasting money on political
correctness if ever I've seen one. I wonder if those lifts were used once in
their first year.)
But the lifts will be an extra cost that is not necessarily needed at
many locations, ramps are a suitable alternative. I recently used Tame
Bridge parkway, where access to the station, in a cutting is via ramps
from street level. Ramps are unlikely to double the cost of a new
station and what is needed is for Network Rail (or who ever is paying
for the station) to challenge a design including lifts when they are
not necessary. I do agree that adding lifts at Eastfields was a waste
of money, as access would have been available anyway.
After years of that happening under New Labour, do we still believe it
to be the case under an alternative government? The PTE areas did very
well for themselves in the '80s and early '90s with new stations,
electrification, more services and not to mention LRT projects in
Greater Manchester, Sheffield, West Midlands and the Airport extension
to the Tyne/Wear Metro, all initiated under the Conservatives despite
the fact that the Metropolitan Counties were mostly controlled by Labour.
"Commuter" <sp...@spamfree.com> wrote in message
news:4a2bfb27$2...@news.x-privat.org...