Google Groups no longer supports new Usenet posts or subscriptions. Historical content remains viewable.
Dismiss

M. D. Sorrel, Marine Engineer, Operations, Construction Management

0 views
Skip to first unread message

David Sorrel

unread,
Nov 29, 1995, 3:00:00 AM11/29/95
to
RESUME

MARCIAL D. SORREL
1 Halcyon Way
Churchlands, Western Australia 6018
Australia
Fax: +619 426 0299
email: dso...@omen.com.au
Compuserve: 100245,2457

KEY WORDS:

construction, management, offshore, marine, operations,
engineering


OBJECTIVE:

Leadership in an aggressive team sharing current skills and
learning new ones.

PERSONAL:

38 years old, married 17 years with 3 children. US Citizen,
able to relocate world wide. Currently scheduled to repatriate
back to US in May 1996.

BIOGRAPHICAL SUMMARY:

David Sorrel is currently a Project Manager with Aker Marine and
working for Amoco Orient Petroleum Company as Installation
Supervisor for the Liuhua 11-1 Development Project in China and
IS based on Perth Western Australia. In this capacity he is
responsible for the installation of the Floating Production
System (FPS), Floating Production, Storage and Offloading Tanker
(FPSO) and Flexible Flowlines and Risers. Twenty-one 40 metric
tonne drag embedment anchors were successfully placed and proof
tensioned on target in 330 meters of water during June and July
1995. Since Joining AOI in 1990. David has been involved in a
number of large mooring projects including the Large Scale
Anchor test in 1990. In 1991, David worked for Shell offshore
in sizing anchors for the Auger TLP. In 1991, he also was lead
engineer in the installation for the Amoco Gombe FPSO in Gabon.
He later supervised the field installation of the system.. In
1992 he managed the design and installation of an offshore
loading terminal in Equatorial Guinea. In 1992 and 1993, David
was in Norway with Norwegian Contractors working on installation
procedures for a large concrete FPS. David also wrote marine
procedures for the Troll Gas GBS. David also has 10 years
experience as a commercial diver including Hyperbaric and wet
welding, marine heavy construction practices and ROV operations.
David has extensive multinational work experience.

EDUCATION:

1989 TEXAS A&M UNIVERSITY
Bachelor of Science Degree in Civil Engineering

1980 THE OCEAN CORPORATION
Commercial Diving School

EXPERIENCE:

AKER OMEGA, INC.
1990 - Present

Project Manager, Aker Marine. Representative Projects
responsible for or involved in during this period include:

Amoco Orient Petroleum Company
Installation of the Liuhua 11-1 Development project offshore
China. Bid preparation, evaluation and management of the
project in Australia, Singapore and China over 3 years.
Norwegian Contractors, Troll Olje (Troll Phase 2): Marine
operations including platform and mooring system installation
engineering and coordination for EPCI bid to Norsk Hydro.

Norwegian Contractors, Troll Gas (Troll Phase 1):
Marine Operations during constuction and installation.

Walter International, Inc., Isla de Bioko Marine Loading
Terminal, Equatorial Guinea:
Field engineering and management for mooring system and loading
hose installation offshore West Africa.

Shell Offshore Inc., Auger Project:
Development of concepts and feasibility of a supply boat barrier
net for Shell's Auger TLP. Also developed conceptual design for
retrieval of lost riser buoys and ROV intervention for the LMS.

Shell Offshore Inc., Auger Project, TLP Tendon Study and Tendon
Installation study:
TLP lateral mooring system (LMS) design development, component
sizing and bid information package. Also developed anchor proof
tensioning acceptance procedures and software to monitor anchor
performance during proof tensioning operations.

BP Exploration Inc., CPT Study:
Compliant tower conceptual design and cost estimating.

Oceaneering Production Systems, Amoco Gombe FPSO Project:
Mooring system installation engineering, component design and
procurement. Field management during installation (offshore West
Africa).

Deepwater, Aramid Mooring Line JIP:
Development of conceptual designs for the mooring systems for a
large, deep water floating production platform for water depths
of 1,500, 3000, 4,500, and 6,000 ft for both all-steel mooring
systems and hybrid aramid mooring systems.

Large Scale Anchor Tests JIP:
Site engineer for anchor tensioning operations during project.
Developed procedures for testing and results interpretation.
Managed final report and presentation.

SUB SEA INTERNATIONAL, INC.
1980 - 1984 and 1985 - 1987

Dive Supervisor and Diver. Representative projects during this
period include:

Dry and wet welding, platform inspection and repair, hot taps,
inshore and offshore pipeline installation and repair.

RAYMOND INTERNATIONAL, INC.
April 1984 - November 1985

Marine Superintendent:
Project start up in United States for three months developing
equipment and project QA/QC procedures for repair to Juaymah Gas
Plant Trestle Concrete Piles. Directed project start up and
training for 50 multinational employees. Assigned as Marine
Superintendent, in charge of all offshore operations for one
year in Saudi Arabia.

0 new messages