> > I've got a friend whose home is in need of rewiring.
>
> > There is a 20 slot Siemens breaker box with QP breakers, circa 2003.
> > But there is no main breaker, Service wires go directly to the bus bars.
> > Outside at meter, there is a 150 A breaker, attached to the meter box.
> > Is this right?
>
> Yes that is OK so long as there is a main shut-off. (If that was what
> you were wondering about????)
thats actually a better design, a failure past the meter but before
the main panel is protected. and working in the main panel is safe....