Colour task bar by Task Name text
|
| |
I'm running Project 2007. I would like to be able to set the colour of certain task bars depending on text appearing in the Task Name. E.g. Say I'm working on a Building Construction project and I want all tasks bars with the work 'Tender' ore 'tender' in the Task Name to be coloured red and all task... more »
|
|
change language of the tiem scale in gantt view
|
| |
hey :) i try to change the language of the time scale in the gantt view. atm i have the gantt view with the several months in portuguese and i need them in english. Is there a way to change that? thx a lot, rgds heide
|
|
Project Viewer
|
| |
Hi, Yes, we do have a Project viewer its the ValleySpeak Project viewer.ValleySpeak Project Server allows the Project Managers to use Microsoft Project as a Managing tools in real time. It enables me to view and share the Microsoft Project schedules with team members in real time . for further details visit [link]... more »
|
|
Task Updates for all Projects
|
| |
How do you find the Task Updates for a Resource who is working on multiple projects. I am not using the Timesheet, and i want to see the Task updates for all the Accepted task for multiple projects for a resource in the past week. Thanks for the help. Junaid
|
|
Task bar length shortens dramatically between 30 & 31 min duration
|
| |
I have one task with a duration of 30 minutes. For some reason its task bar is very short (shorter than 30minutes if viewing the timescale). However, if I increase the task duration to 31 minutes then it correctly displays in the window. I"ve checked the tasks before and after it and have no unusual constraints... more »
|
|
Fixed Work - Units not changing
|
| |
Using MSP 2007 I was added to a project that is in the proposal stage and took over an existing schedule. The original scheduler had it as fixed units, and did a preliminary resource loading. Now the estimates have changed and I need to adjust the hours. I want it to be fixed work and let the duration calculate based on amount of... more »
|
|
Project Tasks not displayed under My Tasks in PWA
|
| |
my client was assigned to the default project manager group in project server 2007, he created a project assigned some tasks to himself, but these yasks do not dispaly at all in project server, he can't view them under My Tasks in PWA
|
|
Make a task appear multiple times?
|
| |
Is it possible to make a task appear multiple times in a ms project view? I want to make a plan which integrates an engineering plan with a production plan. I can insert them to a master plan, and then group by area, but I would like to make certain engineering tasks appear multiple times. For example: The calculation of load bearing structure is a prerequisite... more »
|
|
MPP File
|
| |
I work with project from my office and home. I run project std 2007 at both. When I try to email a file to my work I cant open it. I tried to email it to myself and experience the same problem. When I have finished my project and save it, it is always saved in Adobe reader format. Any help would be... more »
|
|
|