OLAP Cube generation
There are currently too many topics in this group that display first. To make this topic appear first, remove this option from another topic.
There was an error processing your request. Please try again.
flag
  7 messages - Expand all  -  Translate all to Translated (View all originals)
The group you are posting to is a Usenet group. Messages posted to this group will make your email address visible to anyone on the Internet.
Your reply message has not been sent.
Your post was successful
 
From:
To:
Cc:
Followup To:
Add Cc | Add Followup-to | Edit Subject
Subject:
Validation:
For verification purposes please type the characters you see in the picture below or the numbers you hear by clicking the accessibility icon. Listen and type the numbers you hear
 
Jonathan Vardy  
View profile  
 More options Dec 7 2005, 2:02 am
Newsgroups: microsoft.public.project.server
From: "Jonathan Vardy" <Jonathan Va...@discussions.microsoft.com>
Date: Tue, 6 Dec 2005 23:02:02 -0800
Local: Wed, Dec 7 2005 2:02 am
Subject: OLAP Cube generation
Hi,

We've just installed Project Server 2003 (single machine setup) in the
following setup:

Windows Server 2003 SP1
SQL Server 2000
SQL Server SP4
Analysis Server
Analysis Server SP4
Project Server 2003
Project Server SP1
Project Server MUI Dutch
Project Server MUI SP2

All works fine except the cube generation always fails. I've checked the
viewdrop folder settings, the OLAP administrator rights, the COM+ identity
and they are all correct.

We've synced 6 users from the AD which had some periods and comma's so I
removed those just in case but this didn't help either. I've changed the
setting to a number of different ranges but that doesn't help.

Here are the errors from the event log:
Component: Views Notification Service
File: C:\Office\devsp\project\pcportal\source\viewsnotify\ViewNotify.cpp
Line: 127
Error Number: 0x800a0005
Description: <Description><![CDATA[View scheduler received error while
scheduling views]]></Description>
___________________________________
Component: PCSViews
File: ViewsDrop.cls
Line: -1
Error Number: 0x5
Description: <Description><![CDATA[Error Information: Invalid procedure call
or argument
Additional Information: An error occured processing the following view :-
<ViewsDropData>
 <ProjectData>
  <EntProjectName><![CDATA[resglobal] ]></EntProjectName>
  <EntResourceIDList>*</EntResourceIDList>
  <EntResourceStartDate>2005-12-01T00:00:00</EntResourceStartDate>
  <EntResourceFinishDate>2005-12-29T00:00:00</EntResourceFinishDate>

<BuildCubeRequest><CubeUpdate><CubeStart>20051201</CubeStart><CubeFinish>20 051229</CubeFinish><Connection>Provider=SQLOLEDB;
Initial Catalog=ProjectServer;Data
Source=BFEPM1</Connection><DBType>0</DBType><DSOConnection>Provider=SQLOLED B.1;Persist
Security Info=False;Initial Catalog=ProjectServer;Data
Source=BFEPM1</DSOConnection><Server>BFEPM1</Server><CubeDB>ProjectServer</ CubeDB><CubeDesc></CubeDesc><BasePath>ProjectServer</BasePath><CubeGUID>C75 EF86D-4213-45AD-998D-4A06C2013AA1</CubeGUID></CubeUpdate></BuildCubeRequest >
 </ProjectData>
 <OrgGuid>ProjectServer</OrgGuid>
 <BasePath>ProjectServer</BasePath>
 <TimeStamp>2005-12-01T10:00:16</TimeStamp>
</ViewsDropData>]]></Description>
Component: Views Notification Service
File: C:\Office\devsp\project\pcportal\source\viewsnotify\ViewNotify.cpp
Line: 132
Error Number: 0x800a0005
Description: <Description><![CDATA[The views processor failed to process the
following document:
<ViewsDropData>
 <ProjectData>
  <EntProjectName><![CDATA[resglobal] ]></EntProjectName>
  <EntResourceIDList>*</EntResourceIDList>
  <EntResourceStartDate>2005-12-01T00:00:00</EntResourceStartDate>
  <EntResourceFinishDate>2005-12-29T00:00:00</EntResourceFinishDate>

<BuildCubeRequest><CubeUpdate><CubeStart>20051201</CubeStart><CubeFinish>20 051229</CubeFinish><Connection>Provider=SQLOLEDB;
Initial Catalog=ProjectServer;Data
Source=BFEPM1</Connection><DBType>0</DBType><DSOConnection>Provider=SQLOLED B.1;Persist
Security Info=False;Initial Catalog=ProjectServer;Data
Source=BFEPM1</DSOConnection><Server>BFEPM1</Server><CubeDB>ProjectServer</ CubeDB><CubeDesc></CubeDesc><BasePath>ProjectServer</BasePath><CubeGUID>C75 EF86D-4213-45AD-998D-4A06C2013AA1</CubeGUID></CubeUpdate></BuildCubeRequest >
 </ProjectData>
 <OrgGuid>ProjectServer</OrgGuid>
 <BasePath>ProjectServer</BasePath>
 <TimeStamp>2005-12-01T10:00:16</TimeStamp>
</ViewsDropData>]]></Description>
Component: PCSViews
File: ViewsDrop.cls
Line: -1
Error Number: 0x5
Description: <Description><![CDATA[Error Information: Invalid procedure call
or argument
Additional Information: An error occured processing the following view :-
<ViewsDropData>
 <ProjectData>
  <EntProjectName><![CDATA[resglobal] ]></EntProjectName>
  <EntResourceIDList>*</EntResourceIDList>
  <EntResourceStartDate>2005-12-01T00:00:00</EntResourceStartDate>
  <EntResourceFinishDate>2005-12-29T00:00:00</EntResourceFinishDate>

<BuildCubeRequest><CubeUpdate><CubeStart>20051201</CubeStart><CubeFinish>20 051229</CubeFinish><Connection>Provider=SQLOLEDB;
Initial Catalog=ProjectServer;Data
Source=BFEPM1</Connection><DBType>0</DBType><DSOConnection>Provider=SQLOLED B.1;Persist
Security Info=False;Initial Catalog=ProjectServer;Data
Source=BFEPM1</DSOConnection><Server>BFEPM1</Server><CubeDB>ProjectServer</ CubeDB><CubeDesc></CubeDesc><BasePath>ProjectServer</BasePath><CubeGUID>C75 EF86D-4213-45AD-998D-4A06C2013AA1</CubeGUID></CubeUpdate></BuildCubeRequest >
 </ProjectData>
 <OrgGuid>ProjectServer</OrgGuid>
 <BasePath>ProjectServer</BasePath>
 <TimeStamp>2005-12-01T10:00:16</TimeStamp>
</ViewsDropData>]]></Description>
Component: PCSViews
File: ViewsDrop.cls
Line: -1
Description: <Description><![CDATA[Error Information:
Additional Information: An error occured calling
CallViewGenerator(ProjectServer, -1, <ProjectData>
 <EntProjectName><![CDATA[resglobal] ]></EntProjectName>
 <EntResourceIDList>*</EntResourceIDList>
 <EntResourceStartDate>2005-12-01T00:00:00</EntResourceStartDate>
 <EntResourceFinishDate>2005-12-29T00:00:00</EntResourceFinishDate>

<BuildCubeRequest><CubeUpdate><CubeStart>20051201</CubeStart><CubeFinish>20 051229</CubeFinish><DBType>0</DBType><DSOConnection>Provider=SQLOLEDB.1;Per sist
Security Info=False;Initial Catalog=ProjectServer;Data
Source=BFEPM1</DSOConnection><Server>BFEPM1</Server><CubeDB>ProjectServer</ CubeDB><CubeDesc></CubeDesc><BasePath>ProjectServer</BasePath><CubeGUID>C75 EF86D-4213-45AD-998D-4A06C2013AA1</CubeGUID></CubeUpdate></BuildCubeRequest >
</ProjectData>)]]></Description>

Component: PjQuery
File: C:\Office\dev\project\WebClient\source\server\pjquery\PjGenericQuery.cpp
Line: 881
Error Number: 0x80004005
Description: <Description><![CDATA[Assert Detected for Virtual Root
'ProjectServer'. The error code was also included.]]></Description>
Component: PjViewMgr
File: C:\Office\dev\project\WebClient\source\server\pjviewmgr\ViewCreator.cpp
Line: 1448
Error Number: 0x80004005
Description: <Description><![CDATA[Assert Detected. The error code was also
included.]]></Description>
Component: PjQuery
File: C:\Office\dev\project\WebClient\source\server\pjquery\CnxCookie.cpp
Line: 110
Error Number: 0x80004005
Description: <Description><![CDATA[Assert Detected for Virtual Root
'ProjectServer'. The error code was also included.]]></Description>
Component: PjViewMgr
File: C:\Office\dev\project\WebClient\source\server\pjviewmgr\ViewCreator.cpp
Line: 1195
Error Number: 0x80004005
Description: <Description><![CDATA[Assert Detected. The error code was also
included.]]></Description>
 File: C:\Office\dev\project\WebClient\source\utility\pjadorsutil2.cpp
Line: 1691
Error Number: 0x80004005
Description: <Description><![CDATA[Assert Detected. The error code was also
included.]]></Description>
___________________________________
Component: Microsoft OLE DB Service Components
Description: <Description><![CDATA[Unspecified error]]></Description>

My guess is that the bit "Invalid procedure call or argument" is the actual
error but what is causing it I cannot see.
Could we have missed a step somewhere in a servicepack?

Any help would be greatly appreciated.

Jonathan Vardy


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Gary L. Chefetz [MVP]  
View profile  
 More options Dec 7 2005, 10:57 am
Newsgroups: microsoft.public.project.server
From: "Gary L. Chefetz [MVP]" <gary AT chefetz DOT org>
Date: Wed, 7 Dec 2005 10:57:41 -0500
Local: Wed, Dec 7 2005 10:57 am
Subject: Re: OLAP Cube generation
Jonathan:

The most likely cause is permissions for the account running under COM+ To
make this determination, please logon to your system at the server console
using a domain admin account and use the Cube build page to build now. Let
us know what happens.

--

Gary L. Chefetz, MVP
"We wrote the books on Project Server"
http://www.msprojectexperts.com

For Project Server FAQs visit
http://www.projectserverexperts.com

For Project FAQs visit
http://www.mvps.org/project

"Jonathan Vardy" <Jonathan Va...@discussions.microsoft.com> wrote in message
news:A82C3F34-B870-44D0-B69A-314DD17AE2DC@microsoft.com...


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Jonathan Vardy  
View profile  
 More options Dec 13 2005, 4:40 am
Newsgroups: microsoft.public.project.server
From: "Jonathan Vardy" <JonathanVa...@discussions.microsoft.com>
Date: Tue, 13 Dec 2005 01:40:03 -0800
Local: Tues, Dec 13 2005 4:40 am
Subject: Re: OLAP Cube generation
Hi Gary,

We tried logging on with a domain admin and a local admin, it didn't help.
We also scheduled the cube build with a domain admin and a local admin, both
members of the OLAP admin. group, but this didn't help either.

Any other ideas that we could try?

Thanks, Jonathan

"Gary L. Chefetz [MVP]" schreef:


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Gary L. Chefetz [MVP]  
View profile  
 More options Dec 13 2005, 7:44 am
Newsgroups: microsoft.public.project.server
From: "Gary L. Chefetz [MVP]" <gary AT chefetz DOT org>
Date: Tue, 13 Dec 2005 07:44:35 -0500
Local: Tues, Dec 13 2005 7:44 am
Subject: Re: OLAP Cube generation
Jonathan:

My next concern would be the fact that you say you have Project Server SP1
installed with a MUI pack for SP2. If we can't find a logical authentication
issue, then the 0x5 errors might indicate that the system is crashing on the
data.

--

Gary L. Chefetz, MVP
"We wrote the books on Project Server"
http://www.msprojectexperts.com

For Project Server FAQs visit
http://www.projectserverexperts.com

For Project FAQs visit
http://www.mvps.org/project

"Jonathan Vardy" <JonathanVa...@discussions.microsoft.com> wrote in message

news:B02D4D34-65D7-425D-B2A8-B47E57A9A356@microsoft.com...


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Jonathan Vardy  
View profile  
 More options Dec 13 2005, 7:55 am
Newsgroups: microsoft.public.project.server
From: "Jonathan Vardy" <JonathanVa...@discussions.microsoft.com>
Date: Tue, 13 Dec 2005 04:55:03 -0800
Local: Tues, Dec 13 2005 7:55 am
Subject: Re: OLAP Cube generation
Gary,

Is it incorrect to install the MUI SP2 with Project Server SP1? Are there
any steps we can take to debug or test where the error is occuring? Or is the
only possible resolution now to contact MS Support?

Thanks, Jonathan

"Gary L. Chefetz [MVP]" schreef:

...

read more »


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Gary L. Chefetz [MVP]  
View profile  
 More options Dec 13 2005, 8:10 am
Newsgroups: microsoft.public.project.server
From: "Gary L. Chefetz [MVP]" <gary AT chefetz DOT org>
Date: Tue, 13 Dec 2005 08:10:25 -0500
Local: Tues, Dec 13 2005 8:10 am
Subject: Re: OLAP Cube generation
Jonathan:

You can turn on SQL profiler and force a cube build. This should show you
where it's failing, if it's failing in SQL.

--

Gary L. Chefetz, MVP
"We wrote the books on Project Server"
http://www.msprojectexperts.com

For Project Server FAQs visit
http://www.projectserverexperts.com

For Project FAQs visit
http://www.mvps.org/project

"Jonathan Vardy" <JonathanVa...@discussions.microsoft.com> wrote in message

news:AAE1893D-5538-4FA5-9B13-931F3562D7B6@microsoft.com...

...

read more »


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Jonathan Vardy  
View profile  
 More options Dec 14 2005, 3:57 am
Newsgroups: microsoft.public.project.server
From: "Jonathan Vardy" <JonathanVa...@discussions.microsoft.com>
Date: Wed, 14 Dec 2005 00:57:02 -0800
Local: Wed, Dec 14 2005 3:57 am
Subject: Re: OLAP Cube generation
Hi Gary,

Whatever it was, SP2a fixed it. I'm glad it was released, it was in the nick
of time for us :)

Jonathan

"Gary L. Chefetz [MVP]" schreef:

...

read more »


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
End of messages