Hello Ben,
this is not easy. Because the lead can be entered
- in the Dependency inspector by a selected dependency line,
- in der Dependencies inspector by a selected activity row
-or in the #Successor column.
All above do not work in a selection of more than one items.
Please see attached screenshots.
Best regards, Vicky
is it possible to set the lead lag time for multiple entries at once? I have a lot of tasks that are linked FS and I want to make it so they all have a lead/lag of 1 day. is it possible to set multiple entries at once? or do I have to click on each entry individually and set it?
thanks
--