Dear All,

question about weld process use,
 WPS & PQR Based on two process with back-chip and welding

as in PQR Process use in root SMAW and subsequent SAW and back chip with SMAW weld.
in this case can we use SAW PROCESS for back welding? FOR production weld?
--
*With Regards
Shaikh.Hasin



munee...@gmail.com

unread,
Oct 19, 2018, 3:09:26 AM10/19/18
to materials-welding
What is the welding code for the PQR you have qualified?



--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

Souravbohray

unread,
Oct 19, 2018, 11:51:02 AM10/19/18
to Materials & Welding
According to ASME sec 9 removing of backing Nd change in backing not allowed it is essential variable but addition of backing is allowed.you r qualified with smaw as backing if u use saw as backing it is not allowed it means u r changing backing and in process u qualified on that process is to be used as backing for another process u HV to again do qualification.

sandeep kumar

unread,
Oct 22, 2018, 2:32:57 AM10/22/18
to Materials & Welding
according to section 9, deletion of backing & joint design are non-essential variable, Refer QW 402.1 & 402.4. So there is no issue. 
However in SAW, you need to have backing material either as removable backing strip or permanent backing to hold the high heat & weld penetration. in thumb rule, the depth of penetration in SAW is 0.1 X 100 amp for square butt and 0.7 X 100 amp for Y groove welds.

In your case, you have to make separate WPS based on your PQR for SAW only, which should clearly state the applicable proper joint configuration & welding pass sequence.

Thanks & regards
Sandeep Kumar

Hasin Shaikh

unread,
Nov 1, 2018, 2:42:17 AM11/1/18
to material...@googlegroups.com
Thanks

Is it ok if we use in backing first Run with SMAW AND further subsequent Saw weld?

Can you provide me any clause of sec-9 acceptance or non acceptance.
 Regards

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
--
Hasin Shaikh
+91-9924562942

Kannayeram Gnanapandithan

unread,
Nov 1, 2018, 3:03:23 AM11/1/18
to material...@googlegroups.com
2layer, better minimum 6mm smaw
THANKS & BEST REGARDS,
KG.PANDITHAN, BE, IWE,  CSWIP 3.1,
ASNT-Level II in PT,MT,RT & UT.
International Welding Engineer. 
CONSULTANT-WELDING & QUALITY
Mobile no: +919940739349

sandeep kumar

unread,
Nov 6, 2018, 1:53:05 AM11/6/18
to Materials & Welding
Yes you can use. infact its industrial practice to have TIG/ SMAW/ GMAW root run and hot pass with a sufficient throat thickness which is followed by SAW welding.

Thanks & regards
sandeep kumar

munee...@gmail.com

unread,
Nov 6, 2018, 1:53:05 AM11/6/18
to materials-welding
Are you sure the qualifaction as per ASME Section IX and not AWS D1.1?