Team plumb

27 views
Skip to first unread message

Joshua Wilcox

unread,
May 26, 2012, 9:25:20 AM5/26/12
to LvL 1
Just a friendly reminder that the hackspace is under construction today. Please be courteous to the volunteer construction team and if your bored and want to potential get covered in human waste, or blown up by natural gas, feel free to stop by.

Wilcox

Sent from my iPhone

Joshua Wilcox

unread,
May 26, 2012, 8:25:49 PM5/26/12
to LvL 1
I would like to thank everyone in advance for the contribution to the kitchen build. The area is still under construction but there is light at the end of the tunnel.

Our benefactor Bruce Cohen of BC plumbing donated approximately 500 bucks of plumbing and gas materials not to mention 12 hours that typically bill out at 90 bucks a hour.

We are missing one piece for the stove hook up. DO NOT mess with the gas line. This piece will be inserted into the system sometime latter this week.

Check the flicker feed.

D Wilcox

Sent from my iPhone

Brad Luyster

unread,
May 26, 2012, 10:12:08 PM5/26/12
to lv...@googlegroups.com
Thanks for getting all this together, Josh.  We definitely owe you and Bruce a round of drinks.

Nathan Armentrout

unread,
May 27, 2012, 9:43:20 AM5/27/12
to lv...@googlegroups.com
Thanks Josh, Bruce, and everyone else who helped! You rock!!

Christopher Cprek

unread,
May 27, 2012, 6:14:41 PM5/27/12
to lv...@googlegroups.com
Just saw it and it looks great! Thanks Josh, Bruce et al for work well done.

Chris
Reply all
Reply to author
Forward
0 new messages