Weekly status update

8 views
Skip to first unread message

Marie Bienkowski

unread,
Jun 19, 2012, 2:36:44 PM6/19/12
to learnin...@googlegroups.com
Walt:

Got Browser ID, etc. running on his local node.
Next step--get node signing on the ADL node. Need to install couch plugins
Continue Neo4J work
Blockages--what to crosswalk in Neo4J

Lou:

- fixed fstab problem. Have S3 bucket up and running. Only creating
replicator DB on S3 bucket.
Internet Archive API on S3.
Blockage: On Couch/Erlang level error messages
Will contact the CouchDB email list with a error file log

Jim:

Node signing work--think it's complete. Documenting and validating the
install process. 8 step process. Config scripts--ngnix config file,
generate initd script. Also configures Couch with permissions.
Configures GPG. Generate pull request for that.

Will break on Jenkins, but that can be fixed with the Couch plugins.
Will deploy to alpha, which is always the latest, unreleased code. This
will also contain the current Couch with a few additional plugins (e.g.,
BrowserID).

Helping ppl from TN. Trying to bootstrap a node. Backup Jim found was
dated to January. Are backups working? Walt will look.

Look for us at PlugFest!

Marie






--
Marie Bienkowski
Center for Technology in Learning
650-859-5485 (w)
mariebienkowski (twitter)

Reply all
Reply to author
Forward
0 new messages