Did anyone order a new set of lasersaur parts recently?

Which are currently the longest lead time items on the BOM?

-- Steve


Gabriel Helms

unread,
Oct 30, 2012, 2:52:48 PM10/30/12
to lase...@googlegroups.com
For me, it was the lens and tube.

Sincerely,
Gabriel Helms

(H): 916-760-8943
(C): 805-427-5126

j. eric townsend

unread,
Oct 30, 2012, 5:57:41 PM10/30/12
to lase...@googlegroups.com
Last summer my Mitsumi got hung up in at least a week in US customs. It
all arrived ok, but you could tell which packages had been sealed in
Japan and which opened by Customs.
--
J. Eric Townsend
design: www.allartburns.org; hacking: www.flatline.net; HF: KG6ZVQ
PGP: 0xD0D8C2E8 AC9B 0A23 C61A 1B4A 27C5 F799 A681 3C11 D0D8 C2E8

--
J. Eric Townsend, IDSA
design <http://www.allartburns.org>
hacking <http://www.flatline.net>
fabrication <watch this space>

Erik Moon

unread,
Oct 30, 2012, 6:03:17 PM10/30/12
to lase...@googlegroups.com
The sheet metal pieces have been a nightmare for us…

Misumi has sent us several of the pieces TWICE and the large panels THREE times because they were damaged in shipping.

We still haven't received the large sheet pieces without damage, but I gave up…

So, we haven't really run into any long lead time problems with Misumi -- but definitely supply chain issues…



On the other hand -- the E-stop switch took several weeks to arrive from Mouser. The button assembly itself arrived quickly, but the electronic portion of the switch was severely back ordered.

-Erik & Jason

j. eric townsend

unread,
Oct 30, 2012, 6:09:01 PM10/30/12
to lase...@googlegroups.com
Last summer my Mitsumi got hung up in at least a week in US customs. It
all arrived ok, but you could tell which packages had been sealed in
Japan and which opened by Customs.