Received: by 10.14.174.196 with SMTP id x44mr1247979eel.7.1343272349346; Wed, 25 Jul 2012 20:12:29 -0700 (PDT) X-BeenThere: hackerspace_brisbane@googlegroups.com Received: by 10.14.150.12 with SMTP id y12ls222481eej.7.gmail; Wed, 25 Jul 2012 20:12:27 -0700 (PDT) Received: by 10.14.205.195 with SMTP id j43mr1247803eeo.3.1343272347640; Wed, 25 Jul 2012 20:12:27 -0700 (PDT) Received: by 10.14.205.195 with SMTP id j43mr1247801eeo.3.1343272347607; Wed, 25 Jul 2012 20:12:27 -0700 (PDT) Return-Path: Received: from mail-ee0-f52.google.com (mail-ee0-f52.google.com [74.125.83.52]) by gmr-mx.google.com with ESMTPS id i1si1721961eem.0.2012.07.25.20.12.27 (version=TLSv1/SSLv3 cipher=OTHER); Wed, 25 Jul 2012 20:12:27 -0700 (PDT) Received-SPF: pass (google.com: domain of tim.sp...@gmail.com designates 74.125.83.52 as permitted sender) client-ip=74.125.83.52; Authentication-Results: gmr-mx.google.com; spf=pass (google.com: domain of tim.sp...@gmail.com designates 74.125.83.52 as permitted sender) smtp.mail=tim.sp...@gmail.com; dkim=pass header...@gmail.com Received: by eekc41 with SMTP id c41so211407eek.11 for ; Wed, 25 Jul 2012 20:12:27 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20120113; h=mime-version:in-reply-to:references:date:message-id:subject:from:to :content-type; bh=gqxJkIkI025T6ULVAZKBxosmJoOaoQwXB0Em+JQi2+A=; b=rmXMAO3nISHjUQJSWKWhB6IPWJyd4080D6IvMS2K0dLAdUUXTlBrGGqaEfK0Hzu+DZ zpkWfhxO1fYwf7MfbLI4jb5cB/OqJGdonkSY6CH6A8g9udeEZfi4HuOKOYcfwM/Onyrp 7AYneIToJOsiXdQdgooV8MA6v1NJcE4Mkp+EtokdAFfVOxjlGxnFKHxt1q0h7rTNj/us Nxftsi5tSHZcCVHtCwiNYIJVIcgYBWa9bVWd0euMOsh8W2IKBIVarSVgVej+95S+1/0j 6OCOF8p2lUJ3GY4hdGO8e+0TbSgUkehbH7Z0mPdj7YPoiZc2MBEhcGxZ/a6VALx70Ofz iXgw== MIME-Version: 1.0 Received: by 10.14.178.67 with SMTP id e43mr2340520eem.44.1343272347467; Wed, 25 Jul 2012 20:12:27 -0700 (PDT) Received: by 10.14.207.67 with HTTP; Wed, 25 Jul 2012 20:12:27 -0700 (PDT) In-Reply-To: <3A1D8E1A008F46219735B698F1E33...@gmail.com> References: <3A1D8E1A008F46219735B698F1E33...@gmail.com> Date: Thu, 26 Jul 2012 13:12:27 +1000 Message-ID: Subject: Re: Port Hack Cleanup From: Tim Spray To: hackerspace_brisbane@googlegroups.com Content-Type: multipart/alternative; boundary=047d7b6041ba1b7e3a04c5b2f774 --047d7b6041ba1b7e3a04c5b2f774 Content-Type: text/plain; charset=ISO-8859-1 Hello, I will can be over early with a ute but will need to leave by lunch time. -- Regards, Tim On Mon, Jul 16, 2012 at 7:05 PM, Joshua Hogendorn wrote: > Saturday, 28th of July, will be the next cleanup/repair at Port Hack. > > We will be starting at 9am, with a HSBNE provided fry up breakfast. We > will need as many people as possible, so please come along. > > If you are attending, please bring these items. Now in bold because > everyone forgets: > > - *Lunch* or Money for lunch. > - *Water to stay hydrated*. There is water onsite in a pinch, but > bring your own. > - *Gloves* to protect your hands. > - Dress to get dirty. > > > If you have these, please bring them: > > - Respirator > - Dump Vounchers > - Ute for dump runs. > - Long Extension leads. > > > Along with the above items for individual use, we will *need* the > following tools. If you can source ANY of these, please make the effort as > otherwise we will have idle hands: > > - Shovels > - Rakes > - Whippersnippers > - Lawn mower > - Backpack weed sprayers > - Gurneys > - Air blowers > - Socket sets > - Claw hammers > - Pry bars > - Angle grinder > - Welder > > > The aims for this day are to: > > 1. Repair the big door. > 2. Remove and sweep/blow/rake up all plant matter on the concrete > platform. > 3. Remove all flood mud from the concrete platform > 4. Mow and maintain the grassed areas > 5. Remove any remaining rubbish > 6. Gurney the remaining areas. Generally speaking, building exteriors, > the concrete pad, drains, and some interiors. > 7. Potentially replace the clear roofing on the main warehouse, if we > have materials/equipment appropriate. > 8. Potentially tear down/repair the existing doors on the main > warehouse and reposition them appropriately. > > Important things to note: > > - We will not be knocking down walls until we have a lease. > - Cirque du Soleil is now running and will be running on the day. > Ensure you park within the hackerspace, be aware of traffic. > > > Thanks, and hope to see you all there! > > -- > Joshua Hogendorn > PH: 0407710007 > > -- > You received this message because you are subscribed to the Google Groups > "hackerspace_brisbane" group. > To post to this group, send email to hackerspace_brisbane@googlegroups.com > . > To unsubscribe from this group, send email to > hackerspace_brisbane+unsubscribe@googlegroups.com. > For more options, visit this group at > http://groups.google.com/group/hackerspace_brisbane?hl=en. > --047d7b6041ba1b7e3a04c5b2f774 Content-Type: text/html; charset=ISO-8859-1 Content-Transfer-Encoding: quoted-printable Hello,
I will can be over early with a ute but will need to leave by lunc= h time.
--=A0
Regards,

Tim=A0


On Mon, Jul 16, 2012 at 7:05 PM, Josh= ua Hogendorn <jhogend...@gmail.com> wrote:
Saturday, 28th of July, will be the next cleanup/r= epair at Port Hack.

We will be starting at 9am, wi= th a HSBNE provided fry up breakfast. We will need as many people as possib= le, so please come along.

If you are attending, please bring these items. Now in = bold because everyone forgets:
  • Lunch or Money for = lunch.
  • Water to stay hydrated. There is water onsite in a pi= nch, but bring your own.
  • Gloves to protect your hands.
  • Dress to get dirty.

  • If you have these, please bring them:
  • Respirator
  • Dump Vounchers
  • Ute for dump runs.
  • Long Extension leads.

Along with the= above items for individual use, we will need the following tools. I= f you can source ANY of these, please make the effort as otherwise we will = have idle hands:
  • Shovels
  • Rakes
  • Whippersnippers
  • Lawn mow= er
  • Backpack weed sprayers
  • Gurneys
  • Air blowers
  • <= li>Socket sets
  • Claw hammers
  • Pry bars
  • Angle grinder<= /li>
  • Welder

The aims for this day are to:=
  1. Repair the big door.
  2. Remove and sweep/blow/rake = up all plant matter on the concrete platform.
  3. Remove all flood mud = from the concrete platform
  4. Mow and maintain the grassed areas
  5. Remove any remaining rubbish=
  6. Gurney the remaining areas. Generally speaking, building exteriors= , the concrete pad, drains, and some interiors.
  7. Potentially replace= the clear roofing on the main warehouse, if we have materials/equipment ap= propriate.
  8. Potentially tear down/repair the existing doors on the main warehouse a= nd reposition them appropriately.
Important things= to note:
  • We will not be knocking down walls = until we have a lease.
  • Cirque du Soleil is now running and will be running on the day. Ensure = you park within the hackerspace, be aware of traffic.

Thanks, and hope to see you all there!

--=A0
Joshua Hogendorn

=20

--
You received this message because you are subscribed to the Google Groups &= quot;hackerspace_brisbane" group.
To post to this group, send email to hackerspace_brisbane@googlegroups.com<= /a>.
To unsubscribe from this group, send email to
hackerspace_bri= sbane+unsubscribe@googlegroups.com.
For more options, visit this group at http://groups.google.c= om/group/hackerspace_brisbane?hl=3Den.




<= div>

--047d7b6041ba1b7e3a04c5b2f774--