Hi,
It is possible to use time line with a work days dataset (without week-
end in X-axis)
I'm new in google visualization, and I don't know if time line is the
good way to do what i want
Here, a picture with what I want to do.
http://imagik.fr/view-rl/149017
thanks per advance