Account Options

  1. Sign in
The old Google Groups will be going away soon.
Switch to the new Google Groups.
Google Groups Home
« Groups Home
Duration error
There are currently too many topics in this group that display first. To make this topic appear first, remove this option from another topic.
There was an error processing your request. Please try again.
flag
  1 message - Collapse all  -  Translate all to Translated (View all originals)
The group you are posting to is a Usenet group. Messages posted to this group will make your email address visible to anyone on the Internet.
Your reply message has not been sent.
Your post will appear after it is approved by moderators
 
From:
To:
Cc:
Followup To:
Add Cc | Add Followup-to | Edit Subject
Subject:
Validation:
For verification purposes please type the characters you see in the picture below or the numbers you hear by clicking the accessibility icon. Listen and type the numbers you hear
 
George.Kinsman  
View profile  
 More options Mar 18 2011, 3:52 am
From: "George.Kinsman" <george.kins...@gmail.com>
Date: Fri, 18 Mar 2011 00:52:37 -0700 (PDT)
Local: Fri, Mar 18 2011 3:52 am
Subject: Duration error
When creating a new task that starts on the 128th of march (today), an
end date of the 10th of april is't possible.

When I set the start date right on the 18th, dragging the task to the
right by half a day strangely increases the length of the task, even
though I haven't changed the duration at all! On hover the duration
stays the same, but it doesnt seem to be possible to physically end
the task on the 10th of april. I've tried changing all the relevant
properties, to no avail.

Halp!


 
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
End of messages
« Back to Discussions « Newer topic     Older topic »