Gmail Calendar Documents Reader Web more »
Recently Visited Groups | Help | Sign in
Google Groups Home
Inauguration T3
There are currently too many topics in this group that display first. To make this topic appear first, remove this option from another topic.
There was an error processing your request. Please try again.
flag
  19 messages - Collapse all  -  Translate all to Translated (View all originals)
The group you are posting to is a Usenet group. Messages posted to this group will make your email address visible to anyone on the Internet.
Your reply message has not been sent.
Your post was successful
 
From:
To:
Cc:
Followup To:
Add Cc | Add Followup-to | Edit Subject
Subject:
Validation:
For verification purposes please type the characters you see in the picture below or the numbers you hear by clicking the accessibility icon. Listen and type the numbers you hear
 
claude  
View profile   Translate to Translated (View Original)
 More options Dec 12 2006, 7:13 am
Newsgroups: fr.misc.transport.urbain
From: "claude" <claude.geour...@neuf.fr>
Date: 12 Dec 2006 04:13:23 -0800
Local: Tues, Dec 12 2006 7:13 am
Subject: Inauguration T3
Quelqu'un a t'il plus d'info sur l'inauguration du T3.
Il est ouvert à 14h au public, mais a quelle heure a vraiment lieu
l'inauguration et de quelle facon ?

Merci d'avance.

http://www.parisinconnu.com/pceinture/


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
gmas...@hotmail.com  
View profile   Translate to Translated (View Original)
 More options Dec 12 2006, 11:40 am
Newsgroups: fr.misc.transport.urbain
From: gmas...@hotmail.com
Date: 12 Dec 2006 08:40:24 -0800
Local: Tues, Dec 12 2006 11:40 am
Subject: Re: Inauguration T3
Bonjour
claude a écrit :

> Quelqu'un a t'il plus d'info sur l'inauguration du T3.
> Il est ouvert à 14h au public, mais a quelle heure a vraiment lieu
> l'inauguration et de quelle facon ?

> Merci d'avance.

> http://www.parisinconnu.com/pceinture/

http://www.tramway.paris.fr/inauguration/N.asp

Salutations
Gérard Massip


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
claude  
View profile   Translate to Translated (View Original)
 More options Dec 13 2006, 10:49 am
Newsgroups: fr.misc.transport.urbain
From: "claude" <claude.geour...@neuf.fr>
Date: 13 Dec 2006 07:49:32 -0800
Local: Wed, Dec 13 2006 10:49 am
Subject: Re: Inauguration T3
J'ai déja ces infos via ce site que je consulte depuis longtemps.
Je suis adhérent à l'ADEMAS, au COPEF et à l'ASPCRF.

gmas...@hotmail.com a écrit :


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
G.B  
View profile   Translate to Translated (View Original)
 More options Dec 13 2006, 2:16 pm
Newsgroups: fr.misc.transport.urbain
From: "G.B" <bert....@laposte.net>
Date: Wed, 13 Dec 2006 20:16:00 +0100
Subject: Re: Inauguration T3
Préavis de grève du 15 au 19!

"claude" <claude.geour...@neuf.fr> a écrit dans le message de news:
1166024972.666453.155...@f1g2000cwa.googlegroups.com...
J'ai déja ces infos via ce site que je consulte depuis longtemps.
Je suis adhérent à l'ADEMAS, au COPEF et à l'ASPCRF.

gmas...@hotmail.com a écrit :


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Ariel DAHAN  
View profile   Translate to Translated (View Original)
 More options Dec 14 2006, 6:37 am
Newsgroups: fr.misc.transport.urbain
From: "Ariel DAHAN" <cats@ddb>
Date: Thu, 14 Dec 2006 12:37:45 +0100
Local: Thurs, Dec 14 2006 6:37 am
Subject: Re: Inauguration T3
"G.B" <bert....@laposte.net> a écrit dans le message de news:
4580516a$0$25916$ba4ac...@news.orange.fr...

> Préavis de grève du 15 au 19!

Vive la France,
Vive la majorité municipale parisienne,
Vive Delanoé et Bompar !!!

Et tant pis pour les malheureux parisiens qui ne pourront pas se déplacer,
ni en transports en commun puisque grève, ni en voiture, puisque Tramway qui
pourrit tout.


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
gerardmassip@yahoo.fr  
View profile   Translate to Translated (View Original)
 More options Dec 15 2006, 4:57 am
Newsgroups: fr.misc.transport.urbain, fr.misc.transport.rail, france.ile-de-france.paris, fr.misc.handicap
Followup-To: fr.misc.transport.urbain
From: "gerardmas...@yahoo.fr" <gerardmas...@yahoo.fr>
Date: 15 Dec 2006 01:57:05 -0800
Local: Fri, Dec 15 2006 4:57 am
Subject: Re: Inauguration T3
Bonjour

fu2 fr.misc.transport.urbain
Le point de l'association "rocade de Paris"
http://www.leperroquetlibere.com/index.php?action=article&id_article=...

Des partisans du tramway sont prêts à sacrifier certains usagers pour
sauvegarder la performance
http://fr.groups.yahoo.com/group/TransportsIDF/message/1735
c'est juste après le lien avec le 20 minutes d'aujourd'hui et
l'invitation à s'abonner à Télé-tc.

Bon week-end
Gérard Massip


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Ariel DAHAN  
View profile   Translate to Translated (View Original)
 More options Dec 15 2006, 7:19 am
Newsgroups: fr.misc.transport.urbain
From: "Ariel DAHAN" <cats@ddb>
Date: Fri, 15 Dec 2006 13:19:56 +0100
Local: Fri, Dec 15 2006 7:19 am
Subject: Re: Inauguration T3
<gerardmas...@yahoo.fr> a écrit dans le message de news:
1166176625.208214.189...@79g2000cws.googlegroups.com...

> fu2 fr.misc.transport.urbain
> Le point de l'association "rocade de Paris"
> http://www.leperroquetlibere.com/index.php?action=article&id_article=...

> Des partisans du tramway sont prêts à sacrifier certains usagers pour
> sauvegarder la performance

On va faire un sacrifice humain ? Tous à l'hôtel de ville !!! ;-)

MDR


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Didier Dartois  
View profile   Translate to Translated (View Original)
 More options Dec 16 2006, 1:51 pm
Newsgroups: fr.misc.transport.urbain
From: Didier Dartois <ddsnew...@free.fr>
Date: Sat, 16 Dec 2006 19:51:52 +0100
Local: Sat, Dec 16 2006 1:51 pm
Subject: Re: Inauguration T3
Mouais... bof.
J'en connais qui sont encore contre la Tour Eiffel, et l'électricité.
En simplifiant : il y a ceux qui se projettent dans l'avenir et ceux qui
ressassent le passé.

gerardmas...@yahoo.fr a écrit :


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
gerardmassip@yahoo.fr  
View profile   Translate to Translated (View Original)
 More options Dec 16 2006, 5:13 pm
Newsgroups: fr.misc.transport.urbain
From: "gerardmas...@yahoo.fr" <gerardmas...@yahoo.fr>
Date: 16 Dec 2006 14:13:16 -0800
Local: Sat, Dec 16 2006 5:13 pm
Subject: Re: Inauguration T3
Bonjour
Didier Dartois a écrit :

Bizarre comme position de la part de quelqu'un qui, aux dernières
nouvelles, était président de l'ASPCRF
http://www.google.com/search?hl=fr&q=aspcrf&lr= , association affirmant
qu'elle défend la petite ceinture ferroviaire. Ais je raté un
épisode ?

Salutations
Gérard Massip


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Jean-Claude BELLEC  
View profile   Translate to Translated (View Original)
 More options Dec 17 2006, 3:08 am
Newsgroups: fr.misc.transport.urbain
From: Jean-Claude BELLEC <jean-claude.belle...@wanadoo.fr>
Date: Sun, 17 Dec 2006 09:08:38 +0100
Local: Sun, Dec 17 2006 3:08 am
Subject: Re: Inauguration T3
gerardmas...@yahoo.fr a écrit :

> Bonjour

> fu2 fr.misc.transport.urbain
> Le point de l'association "rocade de Paris"
> http://www.leperroquetlibere.com/index.php?action=article&id_article=...

> Des partisans du tramway sont prêts à sacrifier certains usagers pour
> sauvegarder la performance
> http://fr.groups.yahoo.com/group/TransportsIDF/message/1735
> c'est juste après le lien avec le 20 minutes d'aujourd'hui et
> l'invitation à s'abonner à Télé-tc.

> Bon week-end
> Gérard Massip

on inaugure la ligne 2 de montpellier dans le silence, la T3 à LYON

ah PARIS..................

--
Jean-claude.belle...@wanadoo.fr

Homme libre, toujours tu chériras la mer


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Didier Dartois  
View profile   Translate to Translated (View Original)
 More options Dec 18 2006, 3:46 am
Newsgroups: fr.misc.transport.urbain
From: Didier Dartois <ddsnew...@free.fr>
Date: Mon, 18 Dec 2006 09:46:28 +0100
Local: Mon, Dec 18 2006 3:46 am
Subject: Re: Inauguration T3
Faudrait voir à se tenir informé : j'ai occupé ce poste de manière très
temporaire, il y a plusieurs années.

Par ailleurs, la défense de la PC d'après l'ASPCRF est une démarche
tournée vers l'avenir, et pas engluée dans un passé révolu, ce que nous
avons toujours dit et continuons d'affirmer.

gerardmas...@yahoo.fr a écrit :


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
gerardmassip@yahoo.fr  
View profile   Translate to Translated (View Original)
 More options Dec 24 2006, 1:10 am
Newsgroups: fr.misc.transport.urbain, france.ile-de-france.paris
Followup-To: fr.misc.transport.urbain
From: "gerardmas...@yahoo.fr" <gerardmas...@yahoo.fr>
Date: 23 Dec 2006 22:10:09 -0800
Local: Sun, Dec 24 2006 1:10 am
Subject: Re: Inauguration T3
Bonjour

fu2 fr.misc.transport.urbain
Lu dans ville & Transports du 20 décembre 2006
François Enver a écrit:
... La RATP estime pouvoir exploiter d'un seul tenant un T3 qui ferait
entre 21 et 23 km de long du pont du Garigliano à la Porte de la
Chapelle. Au delà, il faudrait selon elle couper la ligne en
deux."Notre souhait, c'est le tramway esploité en un seul morceau,
juge Denis Baupin. Mais après, il faut bien que ça fonctionne !" et
s'il faut couper la ligne en deux, explique M. Sancho de Coulhac,
"l'idée n'est pas d'voir deux lignes en correspondance bout à bout,
mais d'avoir à la jonction des deux un bout qui rentre dans Paris ou
qui va en banlieue". Dans cette hypothèse, l'adjoint aux Transports
parisiens verrait bien des tramways remonter le cours de Vincennes,
pour faire leur terminus à la Nation (...)
================== fin de citation ===================

ça fait au moins plaisir de voir que le projet Tramway express
francilien
http://groups.google.fr/group/alter-auto/browse_frm/thread/2ea63acda4...
a été lu, et que l'on reprend notre idée d'antennes vers
l'intérieur ou l'extérieur de Paris, celles de notre première ligne
sur la PC étant l'intégration du T2 à l'ouest et des raccordements
SNCF de Bercy pour aller gare de Lyon à l'Est.
La proposition d'antenne à Nation s'explique par le fait que Denis
Baupin est un élu du 20éme arrondissement, mais à Nation, il n'y a
qu'un RER, alors que gare de Lyon il y en a deux. D'autre part, à
Nation, l'axe est-ouest Cours de Vincennes + avenue du Trone connaît
de spectaculaires "mises en croix" avec l'axe nord-sud boulevard de
Charonne + boulevard de Picpus. En plus, dans le sens Nation -->
maréchaux, le très efficace couloir à bus commun au 86 et au 351 est
neutralisé quand il y a marché. Faudra-t-il un terminal souterrain à
Nation, qui permettrait aussi d'éviter la traversée du Cours de
Vincennes pour passer d'un sens à l'autre, ou envisager une voie à
contresens sur la contre allée côté 20éme.

Bonnes fêtes
Gérard Massip

Forums transport sur l'Ile-de-France
1 - yahoogroupe (débordant largement du sujet et du cadre
géographique) http://fr.groups.yahoo.com/group/TransportsIDF/
2 - forum de l'ADTC Est Parisien, association d'usagers des transports
--> Service minimum pendant la panne du forum
http://www.antibagnole.com/theforum/viewtopic.php?t=876


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Stephane Fontaine  
View profile   Translate to Translated (View Original)
 More options Dec 24 2006, 8:00 pm
Newsgroups: fr.misc.transport.urbain
From: Stephane Fontaine <fontaine.steph...@gmail.com.invalid>
Date: Mon, 25 Dec 2006 02:00:29 +0100
Local: Sun, Dec 24 2006 8:00 pm
Subject: Re: Inauguration T3
Salut !

François Enver a écrit:

> "l'idée n'est pas d'voir deux lignes en correspondance bout à bout,
> mais d'avoir à la jonction des deux un bout qui rentre dans Paris ou
> qui va en banlieue". Dans cette hypothèse, l'adjoint aux Transports
> parisiens verrait bien des tramways remonter le cours de Vincennes,
> pour faire leur terminus à la Nation (...)

Ah, on dirait que les hommes politiques ont découvert la polyvalence du
tramway :-)

--
A+
     Stephane Fontaine  (Louvain-la-Neuve, Belgique)

Attention piège à SPAM dans mon adresse e-mail !  Retirer le .invalid


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Discussion subject changed to "Inauguration T3 et correspondance avec PC2" by gerardmassip@yahoo.fr
gerardmassip@yahoo.fr  
View profile   Translate to Translated (View Original)
 More options Dec 27 2006, 7:52 am
Newsgroups: fr.misc.transport.urbain, france.ile-de-france.creteil
Followup-To: fr.misc.transport.urbain
From: "gerardmas...@yahoo.fr" <gerardmas...@yahoo.fr>
Date: 27 Dec 2006 04:52:19 -0800
Local: Wed, Dec 27 2006 7:52 am
Subject: Re: Inauguration T3 et correspondance avec PC2
Bonjour

 lolo-mev a écrit dans
http://forum.aceboard.net/5699-327-45457-0-Incoherence.htm
Y a aussi une incohérence au niveau du PC2 quand celui-ci arrive à
l'ancien terminus du PC1 Porte de Charenton et qui annonce toujours ce
jour la correspondance avec le défunt PC1 sur cette partie de l'axe.
D'ailleurs, certains usagers (pas très au fait du remplacement du PC1
par le T3 : si, si je vous jure ça existe : y a des franciliens qui
ont du zapper les nouvelles ou des provinciaux) venant du sens Porte de
la Villette - Porte d'Ivry qui descendent du PC2 à Porte de Charenton,
traversent le boulevard pour arriver devant l'ancien arrêt du PC1 et
qui sont obligés de faire le chemin à l'envers pour reprendre le PC2
suivant... en gueulant un peu à vrai dire.
================= fin de citation =============

Les personnes desservies par la partie Val-de-Marnaise de la ligne de
métro 8 ont droit à une rupture de charge supplémentaire pour leur
trajet sur les maréchaux. Même punition pour les usagers de la partie
sud de la ligne 7 ou des autobus terminant porte d'italie et empruntant
ensuite la PC2

Salutations
Gérard Massip

Mot clé + RATP


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Discussion subject changed to "Inauguration T3" by Ariel DAHAN
Ariel DAHAN  
View profile   Translate to Translated (View Original)
 More options Dec 28 2006, 12:27 pm
Newsgroups: fr.misc.transport.urbain
From: "Ariel DAHAN" <cats@ddb>
Date: Thu, 28 Dec 2006 18:27:16 +0100
Local: Thurs, Dec 28 2006 12:27 pm
Subject: Re: Inauguration T3

<gerardmas...@yahoo.fr> a écrit dans le message de news:
1166940609.218974.251...@n51g2000cwc.googlegroups.com...

> fu2 fr.misc.transport.urbain
> Lu dans ville & Transports du 20 décembre 2006
> François Enver a écrit:
> ... La RATP estime pouvoir exploiter d'un seul tenant un T3 qui ferait
> entre 21 et 23 km de long du pont du Garigliano à la Porte de la
> Chapelle. Au delà, il faudrait selon elle couper la ligne en
> deux."Notre souhait, c'est le tramway esploité en un seul morceau,
> juge Denis Baupin. Mais après, il faut bien que ça fonctionne !" et
> s'il faut couper la ligne en deux, explique M. Sancho de Coulhac,
> "l'idée n'est pas d'voir deux lignes en correspondance bout à bout,
> mais d'avoir à la jonction des deux un bout qui rentre dans Paris ou
> qui va en banlieue". Dans cette hypothèse, l'adjoint aux Transports
> parisiens verrait bien des tramways remonter le cours de Vincennes,
> pour faire leur terminus à la Nation (...)

Je n'arrive toujours pas à comprendre la raison de l'impossibilité technique
d'une ligne en boucle.
Après tout, la plupart des villes ont des lignes en boucle. Sauf Paris.
Poukoidonkesse ?

Celà étant précisé, une boucle avec une antenne entrante ou sortante, comme
Circle Line à Londres, c'est bien aussi.

Mais quel intérêt sur un tram à petite vitesse et faible débit ?

Arieli


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
William JONES  
View profile   Translate to Translated (View Original)
 More options Dec 28 2006, 2:56 pm
Newsgroups: fr.misc.transport.urbain
From: "William JONES" <william.jo...@pandora.be>
Date: Thu, 28 Dec 2006 19:56:12 GMT
Local: Thurs, Dec 28 2006 2:56 pm
Subject: Re: Inauguration T3
Bonsoir,

"Ariel DAHAN" <cats@ddb> a écrit dans le message de news:
4593fed7$0$25914$ba4ac...@news.orange.fr...
|
| <gerardmas...@yahoo.fr> a écrit dans le message de news:
| 1166940609.218974.251...@n51g2000cwc.googlegroups.com...
| > fu2 fr.misc.transport.urbain
| > Lu dans ville & Transports du 20 décembre 2006
| > François Enver a écrit:
| > ... La RATP estime pouvoir exploiter d'un seul tenant un T3 qui ferait
| > entre 21 et 23 km de long du pont du Garigliano à la Porte de la
| > Chapelle. Au delà, il faudrait selon elle couper la ligne en
| > deux."Notre souhait, c'est le tramway esploité en un seul morceau,
| > juge Denis Baupin. Mais après, il faut bien que ça fonctionne !" et
| > s'il faut couper la ligne en deux, explique M. Sancho de Coulhac,
| > "l'idée n'est pas d'voir deux lignes en correspondance bout à bout,
| > mais d'avoir à la jonction des deux un bout qui rentre dans Paris ou
| > qui va en banlieue". Dans cette hypothèse, l'adjoint aux Transports
| > parisiens verrait bien des tramways remonter le cours de Vincennes,
| > pour faire leur terminus à la Nation (...)
|
| Je n'arrive toujours pas à comprendre la raison de l'impossibilité technique
| d'une ligne en boucle.
| Après tout, la plupart des villes ont des lignes en boucle. Sauf Paris.
| Poukoidonkesse ?
|
| Celà étant précisé, une boucle avec une antenne entrante ou sortante, comme
| Circle Line à Londres, c'est bien aussi.
|
| Mais quel intérêt sur un tram à petite vitesse et faible débit ?

Une ligne en boucle, c'est intéressant quand la charge se répartit à peu près uniformément tout le
long du parcours, et que les trajets de tous les clients se superposent (de A à C de B à G de C à F
...)

Ceci étant posé, il reste plusieurs problèmes d'exploitation :
 * Le problème principal d'une ligne en boucle, c'est qu'il est quasi impossible d'y placer un temps
de récupération, vu que par définition il n'y a pas de terminus. On peut décider que les conducteurs
sont remplacés à certains points de la ligne, de façon à leur accorder un battement, mais pour une
remise à l'heure il n'y a qu'une seule solution valable : sauter un tour, faire stationner le tram
le temps nécessaire afin qu'il se remette à l'heure. Si la fréquence est suffisante, on peut
procéder autrement : décaler les trams, çàd. que le véhicule 1 devient le 2, le 2 devient le 3,
etc., de façon à ce que les numéros des trams correspondent à l'horaire théorique.
* En cas d'incident d'exploitation, (collision, déraillement, incendie ...) couper la ligne en
tronçons indépendants et exploiter en navettes est toujours possible, mais bonne chance au
régulateur pour remettre ses véhicules en place après le rétablissement de la ligne !
* Le problème suivant est que la fréquence doit obligatoirement être un diviseur du temps de
parcours : si on fait un tour en 60', la fréquence peut être 2, 3, 4, 5, 6, 10, 12 etc. (tous les
diviseurs de 60). Par contre, avec un temps de parcours de 47', ça devient plus complexe ... Donc,
l'élaboration du graphique de circulation peut être assez amusante !

C'est pourquoi, **SI** un jour il y a des voies continues autour de Paris, je crois que la solution
réside dans des parcours partiels, se chevauchant éventuellement sur certaines sections, comme les
PC1, 2 et 3, et / ou des branches qui quittent la boucle à certains endroits.
--

A+
William.

=============
La mort est une blessure qui ne se referme jamais ; parfois on saigne moins, c'est tout.


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Jean Toulet  
View profile   Translate to Translated (View Original)
 More options Dec 28 2006, 7:22 pm
Newsgroups: fr.misc.transport.urbain
From: "Jean Toulet" <jtoul...@free.fr>
Date: Fri, 29 Dec 2006 01:22:29 +0100
Local: Thurs, Dec 28 2006 7:22 pm
Subject: Re: Inauguration T3

"William JONES" <william.jo...@pandora.be> a écrit dans le message de news:
wjVkh.261299$X02.5282...@phobos.telenet-ops.be...

> Ceci étant posé, il reste plusieurs problèmes d'exploitation :
> * Le problème principal d'une ligne en boucle, c'est qu'il est quasi
> impossible d'y placer un temps
> de récupération, vu que par définition il n'y a pas de terminus.

Mais... ne pourrait-on pas envisager de faire de fausses boucles?

Genre ceci:

 ------------------------------
I                                            I
I                                            I
-------------* A                    I
                 B*----------------

On a bien une boucle tout en ayant deux terminus, non?

Jean Toulet - CeQueJ'EnDis...


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
William JONES  
View profile   Translate to Translated (View Original)
 More options Dec 29 2006, 11:25 am
Newsgroups: fr.misc.transport.urbain
From: "William JONES" <william.jo...@pandora.be>
Date: Fri, 29 Dec 2006 16:25:32 GMT
Local: Fri, Dec 29 2006 11:25 am
Subject: Re: Inauguration T3
Bonsoir,

"Jean Toulet" <jtoul...@free.fr> a écrit dans le message de news:
45945f97$0$318$426a7...@news.free.fr...
|
| "William JONES" <william.jo...@pandora.be> a écrit dans le message de news:
| wjVkh.261299$X02.5282...@phobos.telenet-ops.be...
|
| >
| > Ceci étant posé, il reste plusieurs problèmes d'exploitation :
| > * Le problème principal d'une ligne en boucle, c'est qu'il est quasi
| > impossible d'y placer un temps
| > de récupération, vu que par définition il n'y a pas de terminus.
|
| Mais... ne pourrait-on pas envisager de faire de fausses boucles?
|
| Genre ceci:
|
| ------------------------------
| I                                            I
| I                                            I
| -------------* A                    I
|                 B*----------------
|

Oui, mais alors tu auras toujours le cas du voyageur qui doit aller juste un arrêt plus loin que B
ou A, et qu'on force ainsi à changer de tram pour un arrêt.
--

A+
William.

=============
La mort est une blessure qui ne se referme jamais ; parfois on saigne moins, c'est tout.


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Jean Toulet  
View profile   Translate to Translated (View Original)
 More options Dec 29 2006, 12:32 pm
Newsgroups: fr.misc.transport.urbain
From: "Jean Toulet" <jtoul...@free.fr>
Date: Fri, 29 Dec 2006 18:32:41 +0100
Local: Fri, Dec 29 2006 12:32 pm
Subject: Re: Inauguration T3

"William JONES" <william.jo...@pandora.be> a écrit dans le message de news:
0kblh.262730$iN2.5706...@phobos.telenet-ops.be...

> |
> | Genre ceci:
> |
> | ------------------------------
> | I                                            I
> | I                                            I
> | -------------* A                    I
> |                 B*----------------
> |

> Oui, mais alors tu auras toujours le cas du voyageur qui doit aller juste
> un arrêt plus loin que B
> ou A, et qu'on force ainsi à changer de tram pour un arrêt.

Ben oui, hein. On peut atténuer cet effet en allongeant la partie comprise
entre A et B, mais la contrainte que tu évoques existera toujours...

Jean Toulet - QueChoisir?


    Reply to author    Forward  
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
End of messages
« Back to Discussions « Newer topic     Older topic »

Create a group - Google Groups - Google Home - Terms of Service - Privacy Policy
©2009 Google