Revised Evergreen Criteria and Revised Evergreen Project Plan Instructions
There are currently too many topics in this group that display first. To make this topic appear first, remove this option from another topic.
There was an error processing your request. Please try again.
flag
  2 messages - Collapse all  -  Translate all to Translated (View all originals)
The group you are posting to is a Usenet group. Messages posted to this group will make your email address visible to anyone on the Internet.
Your reply message has not been sent.
Your post was successful
 
From:
To:
Cc:
Followup To:
Add Cc | Add Followup-to | Edit Subject
Subject:
Validation:
For verification purposes please type the characters you see in the picture below or the numbers you hear by clicking the accessibility icon. Listen and type the numbers you hear
 
Greg Black  
View profile  
 More options Dec 1 2009, 7:22 pm
From: Greg Black <greg.bl...@commerce.wa.gov>
Date: Tue, 1 Dec 2009 16:22:44 -0800 (PST)
Local: Tues, Dec 1 2009 7:22 pm
Subject: Revised Evergreen Criteria and Revised Evergreen Project Plan Instructions
We have posted a new version 1.3 of the Evergreen Criteria on the
Evergreen website.  We have also posted a new version 1.2 of the EPP
Instructions.  Both of these documents provide clarification but do
not make substantive changes.

Green Development Plan requirements (Evergreen Criterion 1-1) have
been clarified.  Criteria 5-4 & 6-1 have improved language regarding
how to meet their requirements.  The first table in Criterion 5-11 was
adjusted to correct typo errors.  For Criterion 6-6, the Energy Star
Roofing Calculator is no longer required.  Criterion 7-1 has adjusted
language that clarifies the requirement.  There are a few other minor
changes.

The Instructions on how to fill out the Evergreen Project Plan
incorporate language that gets more specific about how to fill in the
form, what to attach, and what not to attach.  These changes are based
on our experience working with project sponsors to date.  Hopefully
the result will be better first submission EPPs with less need for HTF
Contract Manager follow-up, a shorter approval process, and less paper
being sent into this office.


 
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
Southard, Patti  
View profile  
 More options Dec 3 2009, 2:51 pm
From: "Southard, Patti" <Patti.South...@kingcounty.gov>
Date: Thu, 3 Dec 2009 11:51:06 -0800
Local: Thurs, Dec 3 2009 2:51 pm
Subject: RE: Revised Evergreen Criteria and Revised Evergreen Project Plan Instructions
Hi Grege,

I hope all is well down in Oly! Let me know if you need
any help with the materials stuff?

Happy holidaze-P

Patti Southard
Project Manager
King County GreenTools
201 South Jackson Street, Suite 701
Seattle, WA 98104-3855
206.296.8480

patti.south...@kingcounty.gov
www.greentools.us


 
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
End of messages
« Back to Discussions « Newer topic     Older topic »