From: "Jacob Kaplan-Moss" <jacob.kaplanm...@gmail.com>
Date: Mon, 15 Sep 2008 12:44:29 +0100
Local: Mon, Sep 15 2008 7:44 am
Subject: RFC: Django 1.1 Schedule
Hi folks --
I've just posted The following is a proposed 1.1 release schedule using the above Django 1.1 Schedule We'll release Django 1.1 the week of March 16th, 2009. This is a Given that final target date, below are the rest of the dates for the * September 15, 2008: feature proposal phase begins. * November 10, 2008: draft 1.1 feature list posted. * November 15, 2008: final 1.1 feature list posted; work phase begins. * January 15, 2009: work phase ends; all open branches must be merged, * January 20, 2009: Django 1.1 alpha. * February 15, 2009: complete feature freeze for 1.1; only bug fixes * February 20, 2009: Django 1.1 beta. * March 10, 2009: String freeze for Django 1.1. * March 12, 2009: Django 1.1 rc 1. * March 16-20, 2009: Django 1.1 Proposing features for 1.1 To propose features for 1.1, make a post on django-dev, and add a link Jacob You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
| ||||||||||||||