From: "Stephen I. Woolhead" <Step...@perfectphase.com>
Date: Sat, 27 Oct 2012 00:18:53 +0000
Local: Fri, Oct 26 2012 8:18 pm
Subject: RE: [makespace] Re: Painting the space
Given how long it’s likely to take to paint the main room (and others), is there any mileage in doing it at the weekend? Would be far easier if we could just get it done in one hit, would be cheaper too if we where to hire a small tower to fix the water damage on the wall as we would only need it for a single day?
Cheers,
Stephen
From: Elsmorian
I think this time frame will work well, at the end of the Maker meeting on the 1st Nov we can ask people to clear the main room ready for the 6th. Whilst rollers on painting poles will get us fairly high, I think an "industrial" step ladder or scaffolding tower would be needed for the top.
Some useful links:
http://www.hss.com/index.php?s=scafolding+tower something like http://www.hss.com/g/69908/Power-Tower.html thats fairly easy to move, and still gets some height I would have thought would be idea.
http://www.decoratingdirect.co.uk/shop/product/search?searchword=floo...
The decorating direct site seems to have a lot of stuff, might be handy place to get rollers, extension poles etc from too.
You must Sign in before you can post messages.
To post a message you must first join this group.
Please update your nickname on the subscription settings page before posting.
You do not have the permission required to post.
| ||||||||||||||