Account Options

  1. Sign in
The old Google Groups will be going away soon, but your browser is incompatible with the new version.
Google Groups Home
« Groups Home
Message from discussion Preview of the Rio Grande Separated Bike Lanes

Received: by 10.101.180.28 with SMTP id h28mr1156155anp.24.1334770319997;
        Wed, 18 Apr 2012 10:31:59 -0700 (PDT)
X-BeenThere: austin-bac@googlegroups.com
Received: by 10.236.84.232 with SMTP id s68ls1772405yhe.5.gmail; Wed, 18 Apr
 2012 10:31:59 -0700 (PDT)
Received: by 10.236.116.135 with SMTP id g7mr455896yhh.20.1334770319302;
        Wed, 18 Apr 2012 10:31:59 -0700 (PDT)
Date: Wed, 18 Apr 2012 10:31:58 -0700 (PDT)
From: Ramon Martinez <ramon.in...@gmail.com>
To: austin-bac@googlegroups.com
Message-ID: <3466028.379.1334770318426.JavaMail.geo-discussion-forums@ynnn9>
Subject: Preview of the Rio Grande Separated Bike Lanes
MIME-Version: 1.0
Content-Type: multipart/mixed; 
	boundary="----=_Part_377_22066343.1334770318425"

------=_Part_377_22066343.1334770318425
Content-Type: multipart/alternative; 
	boundary="----=_Part_378_25445034.1334770318425"

------=_Part_378_25445034.1334770318425
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 7bit

Everyone, 

The Rio Grande bike lanes are pretty much done and ready to go, awaiting 
their official unveiling next Monday, the 23rd at 4:30pm. We took a short 
stroll through the lanes and snapped some photo's, from MLK to 24th st in 
the West Campus neighborhood. Here's our review and take<https://www.facebook.com/media/set/?set=a.405180852826173.98299.283334751677451&type=1>from the experience. We wanted to give a big thanks to everyone who's been 
involved in making this project come to life. These are both challenging 
and promising times for Austin but it will be through projects like these 
that our city can continue to grow and maintain the quality of life that 
we've all come to enjoy and cherish. 

Ramon Martinez
HOPE LIKES BIKES <https://www.facebook.com/HOPEbikes?ref=tn_tnmn>

------=_Part_378_25445034.1334770318425
Content-Type: text/html; charset=utf-8
Content-Transfer-Encoding: 7bit

Everyone, <br><br>The Rio Grande bike lanes are pretty much done and ready to go, awaiting their official unveiling next Monday, the 23rd at 4:30pm. We took a short stroll through the lanes and snapped some photo's, from MLK to 24th st in the West Campus neighborhood. Here's our <a href="https://www.facebook.com/media/set/?set=a.405180852826173.98299.283334751677451&amp;type=1">review and take</a> from the experience. We wanted to give a big thanks to everyone who's been involved in making this project come to life. These are both challenging and promising times for Austin but it will be through projects like these that our city can continue to grow and maintain the quality of life that we've all come to enjoy and cherish. <br><br>Ramon Martinez<br><a href="https://www.facebook.com/HOPEbikes?ref=tn_tnmn">HOPE LIKES BIKES</a><br>
------=_Part_378_25445034.1334770318425--

------=_Part_377_22066343.1334770318425--