Thanks for your insight. Much of the land where this particular RR
(Pensacola & Mobile) is located is swamp, so I guess the going would
have been quite slow. The RR was only in existence a few years before
the Confederates tore it up. Thanks again!
Speaking of grading, did they bother to compact the fills
in days of yore or did they pile the dirt and let nature
take its course? Normal foot and animal traffic on the
fill as it's being placeded will compact it to a fair
degree but I've never seen pictures of anything that
resembles a horse-drawn compacter/roller/etc.
moj...@iwvisp.com (Everett M. Greene) wrote:
>Sir F. A. Rien <jaS...@gbr.online.com> writes:
> [snip]
> >> The graders then, would have worked far in advance of the ties and rails.
> >> Probably working from several set 'start' points simultaneously. The T&T did
> >> this in the Amargosa Canyon, working from Sperry, Tecopa and mid point.
> >
> >Speaking of grading, did they bother to compact the fills
> >in days of yore or did they pile the dirt and let nature
> >take its course? Normal foot and animal traffic on the
> >fill as it's being placeded will compact it to a fair
> >degree but I've never seen pictures of anything that
> >resembles a horse-drawn compacter/roller/etc.
>
> I don't know ...
>
> The T&T had several huge fills, some nearly 100' high and they're still
> there except where the Amargosa River [or other water courses] altered
> course and slowly ate away the base causing collapse. Most were overcoated
> with the detrus of the borate mining, that forms a fairly hard coating,
> though it will dissolve in heavy rain.
>
> All the fills [except those done to 'fill' trestles] on the DVRR were rock
> faced - quite beautiful looking.
Mr. Sir Rien,
I was going to contact you directly regarding some questions
about DV railroads but j...@gbr.com doesn't work.